Project Detail
|
|
089 CN 425 H832901C 089-C-(205)T FLAGSTAFF-CAMERON HIGHWAY (TIMBERLINE TO DEADMAN FLAT RD)
|
Flagstaff District Item #25913
|
|
Engineering Specialist: David Do Pre-Qualification: YES Bid Opening: 1/11/2013 11:00:00 AM
|
SYSTEM PRESERVATION-RESTORATION/REHAB/RESURFACE
|
|
|
**The proposed project is located in Coconino County within the Coconino National Forest, on US 89 northeast of the City of Flagstaff, beginning at Milepost 425.70 and extending north to Milepost 434.50. The proposed work includes microsurfacing the roadway surface and striping.
|
| Plans |
Cost |
| Bid Set |
N/A |
| Spec Set |
N/A |
| Earth Work |
N/A |
| Cross Section |
N/A |

Last Updated 06/20/2013 04:32 AM
|