The Quantlist checklists contained in these pages were developed by ADOT for ADOT administered projects using ADOT specifications and standards. They may be freely adapted for use by others with the following stipulations:
Quantlist Name |
Standard Specification Section Number |
Version
Date |
Minimum Frequency |
General Provisions Division 1 |
| Bulletin Board Job Site |
(107) |
06012011 |
One per project |
| Specific Contractor Quality Control |
(106) |
08292006 |
One per month per specified material type |
Grading - Division II |
| Earthwork |
(201, 202, 203) |
01272010 |
One per Week |
| Furnished Water |
(209) |
07292009 |
One per water source |
| Geotextile Fabric |
(208) |
07292009 |
One per material type |
Subgrade, Subases and Bases - Division III |
| Aggregate Bases and Subbases |
(303) |
10132009 |
One per week |
| Cement Treated Base |
(304) |
07292009 |
One per week. |
| Cement Treated Subgrade |
(302) |
07292009 |
One per week. |
| Geocomposite Wall Drain |
(307) |
12182003 |
One per Wall Reference # |
| Lean Concrete Base |
(305) |
07292009 |
One per week. |
| Lime Treated Bases |
(301) |
07292009 |
One per week. |
Asphalt Roadways - Division IV |
| AC with RAP |
(406, 415, 416, and 417) |
05292012 |
One per week |
| ACFC (407) ACFC-AR (414) |
(407/414) |
05292012 |
One per week |
| Asphalt Drum / Batch Plant |
(406 thru 417) |
05292012 |
One per week |
| Asphaltic Concrete 406/415/416/417 |
(406/415/416/417) |
05292012 |
One per week |
| Asphalt Rubber Blending & Hot Plant Mix |
(415/414) |
05292012 |
One per week |
| Bituminous Tack Coat |
(404) |
05292012 |
One per week |
| Chip Seal Coat |
(404) |
05292012 |
One per week |
| Asphaltic Concrete (Asphalt Rubber) 413 |
(413) |
05292012 |
One per week |
Concrete Roadways - Division IV |
| PCCP (Pre-Paving Quality Assurance) |
(401) |
02022006 |
One per week |
| PCCP (Slip Form Placement and Curing) |
(401) |
02022006 |
One per week |
| PCCP (Fixed Form Placement and Curing) |
(401) |
02022006 |
One per week |
| PCCP (Joints, Dowels and Tie Bars) |
(401) |
02022006 |
One per week |
| PCCP (Sawing and Sealing) |
(401) |
02022006 |
One per week |
| PCCP (Crack Repair) |
(401) |
02022006 |
One per shift when required |
Drainage Facilities - Division V |
| Cast-in-Place Pipe |
(501) |
12142010 |
One per week |
| Corrugated Metal Pipe |
(501) |
12142010 |
One per week |
| Plastic Pipe |
(501) |
05162001 |
One per week |
| Reinforced Concrete Pipe |
(501) |
12142010 |
One per week |
Structures - Division VI |
| Concrete Box Culverts |
(601) |
04252001 |
One per structure |
| Approach /Anchor Slab with Joint |
(601) |
12182003 |
One per joint |
| Bridge Deck Joint |
(601) |
12182003 |
One per span |
| Bridge Deck (Superstructure) |
(601) |
09302004 |
One per pour |
| Cast in Place Box Girder Bridge |
(601) |
12182003 |
One per span |
| Drilled Shaft (Dry Excavation) |
(609) |
07282005 |
One per week |
| Drilled Shaft (Wet Excavation) |
609) |
07282005 |
One per week |
| Falsework |
(601) |
04252001 |
One per setup |
| Post Tensioning |
(602) |
12082011 |
The first girder, plus once per anchorage to
anchorage of structure. |
| Post Tensioning - Grouting |
(602) |
12082011 |
The first girder, plus once per anchorage to anchorage of structure. |
| Precast Concrete l-Beams & Box Beams |
(601) |
12182003 |
One per span |
| Reinforcing Steel Placement |
(605) |
10252004 |
Once prior to pour |
| Substructure |
(601) |
12182003 |
One per span |
Signs and Markers - Division VI |
| Overhead Sign Structures |
(606) |
02022010 |
One per Unit |
| Warning Marker & Regulatory Sign Panels |
(606) |
02022010 |
One per Type |
| Overhead Tapered Tube Structure |
(606) |
02022010 |
One per unit |
| Roadside Sign Supports: Breakaway Posts S & W |
(607) |
02022010 |
One per pour / days production |
| Milepost Markers |
(607) |
02022010 |
One per project |
| Roadside Sign Supports: Perforated |
(607) |
02022010 |
One per week |
| Overhead Sign Panels |
(608) |
02022010 |
One per Type |
Traffic Control Facilities - Division VII |
| Arrow Panels & Changeable Message Boards |
(701) |
11142011 |
One per week |
| Initial Pavement Markings (708) |
(708) |
11292012 |
One per week |
| Pavement Markings |
(701-704-705-706-708) |
09112008 |
One per application |
| Stripe Obliteration |
(701) |
11302012 |
One per week |
| Striping Administrative |
(701, 704, 706, 708, 709) |
11292012 |
One per project |
| Traffic Control Flagging Stations |
(701) |
11142011 |
One per week |
| Traffic Control Temporary Barriers / Attenuators / Sand Barrels |
(701) |
11142011 |
One per week |
| Traffic Control Work Zone |
(701) |
11142011 |
One per week |
| Truck-Mounted Attenuators |
(701) |
11142011 |
One per week |
Traffic Signals and Highway Lighting (Poles) Division VII |
| Cabinets FMS |
(734) |
05252006 |
One per week |
| Electrical Conductors |
(732) |
05252006 |
One per week |
| Electrical Conduit |
(732) |
05252006 |
One per week |
| Electrical Grounding |
(732) |
05252006 |
One per week |
| No. 5 & 7 Pull Box with Extension |
(732) |
05252006 |
One per week |
| No. 9 Pull Box |
(732) |
05252006 |
One per week |
| Saw Cut-Vehicle Loop Detectors |
(735) |
05252006 |
One per week |
| Traffic Signal and Hwy Light (Foundations) |
(731) |
05252006 |
One per week |
| Traffic Signal and Hwy Lighting (Poles) |
(731) |
02252006 |
One per week |
Roadside Development - Division VIII |
| Class II Seeding |
(805) |
11072011 |
One per 15 acres |
| Irrigation System Construction |
(808) |
11072011 |
Once per controller |
| Landscape Construction |
(801 & 808) |
11072011 |
One per month |
| Landscape Establishment |
(807) |
08222011 |
Once every two months |
| Storm Water - Administrative |
(104) |
06212011 |
One per project |
| Storm Water: BMP Inspection |
(810) |
07052011 |
One per 14 Calendar day or after each 1/2" or more rain event |
| Storm Water: Good Housekeeping |
(810) |
06222011 |
One per month |
| Temporary Irrigation System |
(805, 807, 808) |
11072011 |
Once each three month, or as approved by the RLA |
Pump House - Division VIII |
| Pump House Electrical Equipment |
(808) |
06062006 |
One per pump house |
| Pump House Electrical Construction |
(808) |
06062006 |
One per pump house |
Guardrail Incidentals - Division IX |
| ET-Plus End Treatment HBA Post (AC) |
(905) |
10062011 |
One per Installation |
| ET-Plus End Treatment (Concrete) |
(905) |
10112011 |
One per Installation |
| FLEAT-350 End Treatment |
(905) |
10062011 |
One per Installation |
| SKT-350 End Treatment (AC) |
(905) |
10062011 |
One per Installation |
| SKT-350 End Treatment (Concrete) |
(905) |
10062011 |
One per Installation |
| SRT-350 End Treatment HBA Posts (AC) SS-355 |
(905) |
10062011 |
One per Installation |
| Quadguard System |
(905) |
02202002 |
One per Installation |
| Thrie Beam Guardrail |
(905) |
10062011 |
One per Run |
| W-Beam Guardrail |
(905) |
07062011 |
One per Run |
Other Incidentals - Division IX |
| Concrete Curb and Sidewalks |
(908) |
04022001 |
One per week |
| Chain Link Fence and Gates |
(902) |
04182005 |
One per 5000 LF (based on pay item) |
| Masonry Walls |
(914) |
10112011 |
One per reference number or once a week |
| Mechanically Stabilized Earth Walls |
(914) |
04272005 |
One per Week |
| Wire Fence and Gates |
(903) |
04182005 |
One per 5000 LF (based on pay item) |
Cable Barrier - Division IX |
| Brifen Wire Rope Safety Fence |
(905) |
11252003 |
One per run |
| Median Cable Barrier & Anchor System |
(905) |
12032002 |
One per run |
Materials - Division X |
| Concrete Class S or B |
(1006) |
01312006 |
One per week |
| Concrete Curing |
(1006) |
06012011 |
One per week |
|
| Field Red Lines |
(100) |
12072009 |
One per Project |
| Final Estimate Checklist (CB 12-02) |
(100) |
10012012 |
|
Drafts |
| Class II Seeding - Administrative |
|
|
|
| Class II Seeding - Construction |
|
|
|
| Seeding for Shoulder Build-up Areas |
|
|
|