The Final Environmental Assessment (FEA) documents the environmental impacts and mitigation measures for the Interstate 17 Corridor Study from the State Route 179 traffic interchange (TI) to Interstate 40 TI. The FEA for this federally-funded project was approved by the Federal Highway Administration on June 26, 2012. The FEA was prepared in an addendum format, and must be used in conjunction with the Draft Environmental Assessment.
- Adobe Reader
Documents are posted as they become available in PDF format, which requires Adobe Reader to view.

