Home Page 
 






 

Interstate 15 Virgin River Bridge No. 6 Rehabilitation

   

 ADOT Project No. 015 MO 015 H8574 01C

Comment period ends Friday, April 26!

The Arizona Department of Transportation (ADOT), in association with the Federal Highway Administration (FHWA), is proposing a bridge rehabilitation project on Interstate 15 (I-15). ADOT has received a $21.6 million grant from FHWA to rehabilitate one of the seven bridges on I-15 in the northwest corner of the state. The funds will be used to improve Virgin River Bridge No. 6 at milepost 15.58 on this heavily traveled corridor that connects Nevada, Arizona and Utah. ADOT and FHWA have prepared a Draft Environmental Assessment (EA) per the requirements of the National Environmental Policy Act.

Your Input is Important!
Submit comments: 
Online
Mail: c/o I-15 Bridge 6, 101 N. 1st Avenue, Suite 3100, Phoenix, AZ 85003 
Email: projects@azdot.gov 
Phone: 855.712.8350 
Fax: 602.253.1202

A public hearing was held on Wednesday, April 10, 2013, at Beaver Dam High School. The project team provided information on the potential environmental impacts of the proposed project and a court reporter was on hand to record the proceedings, including verbal comments.

View the presentation, public hearing handout and display boards.

The Draft EA is still available for review through April 26 at the following locations:

  • The ADOT EPG web page
  • Mesquite Library
    121 W. 1st North St., Mesquite, NV 89027
  • St. George Library
    88 W. 100 South, St. George, UT 84770
  • Beaver Dam Lodge
    452 Old Highway 91 North, Beaver Dam, AZ 86432

Map

Project Information Contact:
Mackenzie Kirby
Flagstaff District Senior Community Relations Officer
928.779.7554

 

Subscribe to receive future project updates  Keep informed about this project, subscribe to receive future project updates by email.

    Arizona Department of Transportation    
   Disclaimer & Privacy Statement  |   Contact ADOT