ADOT, in association with the Federal Highway Association, evaluated improvements to I-19 to alleviate congestion and increase capacity within the corridor. The purpose of this project was to evaluate long-term improvements (2030) to I-19 between San Xavier Road and the I-10/I-19 traffic interchange.

ADOT and FHWA  has evaluated the need for construction of the ultimate or long-term improvements, and identified those improvements in the Final Design Concept Report, to meet the needs of the traveling public:

Project History
I-19 Corridor Study: Interstate 10 to Pima/Santa Cruz County Line
ADOT completed a study in 2003 to identify transportation needs for the corridor through the year 2030. The study recommended long-term improvements through the year 2030 including additional lanes, auxiliary lanes and frontage roads in each direction of travel from San Xavier Road to I-10 with preferred short- and mid-term improvements, including additional interim travel lanes.

I-19 Project Assessment: San Xavier Road to Ajo Way
ADOT completed a Project Assessment (PA) in 2003. The purpose of the PA was to evaluate the feasibility of increasing the capacity of I-19.

I-10/I-19 Traffic Interchange
Construction of the traffic interchange was completed in 2004.

I-19 Design Concept Report: San Xavier Road to I-10
ADOT completed the Design Concept Report (DCR) in spring 2012.  The report is available by link to this page.

Project Details

I-19 Corridor Study: Interstate 10 to Pima/Santa Cruz County Line
ADOT completed a study in 2003 to identify transportation needs for the corridor through the year 2030. The study recommended long-term improvements through the year 2030 including additional lanes, auxiliary lanes and frontage roads in each direction of travel from San Xavier Road to I-10 with preferred short- and mid-term improvements, including additional interim travel lanes.

I-19 Project Assessment: San Xavier Road to Ajo Way
ADOT completed a Project Assessment (PA) in 2003. The purpose of the PA was to evaluate the feasibility of increasing the capacity of I-19.

I-10/I-19 Traffic Interchange
Construction of the traffic interchange was completed in 2004.



Your thoughts, opinions and ideas are important to ADOT. We encourage public participation and look forward to hearing from you by phone or email.

projects@azdot.gov

Project Hotline:
855.712.8530




Subscribe to receive future project updates  Keep informed about this project, subscribe to receive future project updates by email.

 