The CMP should have a description of the physical corridor of the road and its safety. Such description includes a discussion of the design standards for any proposed modifications to the roadway (e.g., shoulder improvements, road widening, curve straightening). The document should evaluate the likely effects of designation to the natural and cultural intrinsic qualities associated with the byway corridor.

There also should be discussion on how the "footprint" of the corridor was developed by determining why the endpoints and widths were chosen along its length.

The CMP should provide a general review of the roadway's safety and accident record to identify any improvements to the highway by design, maintenance or operation to enhance the motorist enjoyment of the scenic road. The CMP should identify areas that may be problems for drivers who are not familiar with the route and identify possible corrections.

Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)
  • Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.
  • De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.