State Route 189 Corridor Projects

   

SR 189: Long-Term Study

International Border to Grand Avenue Design Concept Report and Environmental Assessment

ADOT is working on a Design Concept Report and Environmental Assessment for SR 189 between the US-Mexico Border and the B-19 junction to develop a long-range plan for future improvements. The study is anticipated to take 18 to 24 months and will include a minimum of three public meetings throughout the process.

A Design Concept Report documents preliminary technical studies, alternatives considered, the preferred alternative and preliminary design plans. An Environmental Assessment is federally required documentation that assesses the potential environmental impacts of the proposed alternatives that the DCR evaluates.

To receive updates and stay informed on this study, please sign up to receive emails by contacting sr189tograndave@azdot.gov.

More Information

Public Meeting – 5/31/12

Public Meeting Materials – 6/8/11


Your thoughts, opinions and ideas are important to ADOT. We encourage public participation and look forward to hearing from you by phone or email.

Project Information

1.855.712.8530

Subscribe to receive updates on SR 189 Projects  Keep informed about SR 189 projects, subscribe to receive future project updates by email.


 