  04/05/13

Pavement improvement project on Interstate 10 east of Quartzsite begins on Monday

  03/06/13

Interstate 10 Rest Area at Bouse Wash to close for restoration

Avenue 3E Bridge Widening Project

  Project No.: SS93101C
  Location: Avenue 3E in Yuma between Gila Ridge Road and 24th Street
  Contractor:

Skanska USA Civil West Rocky Mountain District Inc.

  Project Cost: $7.7 million
  Scope: Project consists of widening and improving the Avenue 3E bridge for the City of Yuma. The new bridge will have six lanes including a median, new pavement, new guardrails and new pedestrian walkways. An additional turning lane will also be built at the eastbound I-8 off-ramp to compliment the new bridge.
  Duration: August 2012 – summer 2013
     

Business Route 8 (4th Avenue) Pavement Preservation Project

  Project No.: SS99301C/H799901C
  Location: Business Route 8 (4th Avenue) in City of Yuma from state line to Catalina Drive.
  Contractor: DPE Construction, Inc.
  Project Cost: $3.5 million
  Scope: Project consists of removing and replacing approximately three miles of pavement on B8 (4th Avenue) for the City of Yuma.  
  Duration: April 2013 - August 2013
     
 

Interstate 8, MP 66 - 72 Pavement Preservation Project

  Project No.: H832601C
  Location: Interstate 8 from mileposts 66-72
  Contractor: FANN Contracting, Inc.
  Project Cost: $4,960,938.00
  Scope: Project consists of removing and replacing six miles of pavement in Dateland near Exit 67. Project also consists of guardrail work, shoulder build-up and new pavement markings.
  Duration: February 2013 - summer 2013
     

Interstate 10, Bouse Wash Rest Area Rehabilitation

  Project No.: H821201C
  Location: I-10 at MP 52 in La Paz County
  Contractor: Intermountain West Civil Constructors, Inc.
  Project Cost: $1 million
  Scope:

Project consists of rehabilitating the eastbound and westbound Bouse Wash Rest Areas.
*Rest areas closed during construction.

  Duration: March 2013 - summer 2013
     

Interstate 10, Sun Valley Parkway & Wintersburg Traffic Interchanges

  Project No.: H800101C
  Location: I-10 west of Phoenix (mile posts 98-109)
  Contractor:

Combs Construction Company, Inc.

  Project Cost: $1.3 million
  Scope: Project consists of repaving a section both traffic interchanges and exit ramps. Project also consists of repairing deck joints, replacing guardrail and repairing fencing.
  Duration: September 2012 – spring 2013
     

Interstate 10, US 60 to Hovatter Road

  Project No.: H853901C
  Location: I-10 between MP 32-52
  Contractor: Cholla Pavement Maintenance, Inc.
  Project Cost: $507,350.00
  Scope:

Project consists of sealing cracks on a 20 mile segment of I-10 east of Quartzsite.

  Duration: February 2013 - summer 2013
     

Juan Sanchez Boulevard, Avenue H - Avenue F

  Project No.: SS96901C
  Location: Juan Sanchez Blvd. in the City of San Luis between Ave. H and Ave. F
  Contractor: Grey Mountain Construction, LLC.
  Project Cost: $621,248.00
  Scope: Project consists of removing and replacing approximately two miles of pavement in Yuma County. Project also consists of shoulder build-up and new pavement markings and signage.
  Duration: February 2013 - summer 2013
     

Somerton Avenue Pavement Improvement Project

  Project No.: SS90301C
  Location: Somerton Ave., in the town of Somerton between 14th Street and County 15th Street
  Contractor: Grey Mountain Construction, LLC.
  Project Cost: $421,497.00
  Scope: Project consists of removing and replacing the pavement on Somerton Ave. from 14th St. to County 15th St. in Yuma County. Project also consists of new pavement markings.
  Duration: February 2013 - summer 2013
     

Spur to Colorado River Bridge

  Project No.: H799801C
  Location: 3rd Street to State Route 95 (Riverside Drive) in Parker
  Contractor:

Combs Construction Company, Inc.

  Project Cost: $930,000.00
  Scope: Project consists of removing and replacing a section of SR 95 from 3rd Street to Riverside Drive. Additional work also includes replacing driveways, sidewalks and new pavement markings.
  Duration: January 2013 – spring 2013
     

US 95 Pavement Marking Replacement Project

  Project No.: SH46101C
  Location: US 95 from MP 1-24
  Contractor: Roadsafe Traffic Systems
  Project Cost: $287,360.00
  Scope: Project consists of restriping US 95 from San Luis to Yuma.
  Duration: April 2013 - summer 2013
     
SR 195 I-8 to US 95 - Design Concept Report
  Project No.: 195 YU 27 H7043 01L
  Location: State Route (SR) 195 between Interstate 8 and US 95 in Yuma
  Contractor: The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
  Scope: Engineering and environmental studies have been initiated to determine what improvements would be needed.
  Duration:

2007-2012

     
US 95 Milepost 42 to Milepost 66 - Design Concept Report
  Project No.: 095 YU 42 H7022 01L
  Location: US 95 between approximate MP 42 and MP 66, located on the U.S. Army Yuma Proving Ground (YPG) in Yuma and La Paz Counties, Arizona.
  Contractor: The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
  Project Cost:  
  Scope: An engineering and environmental study is being completed to determine what improvements are needed for the future operation of US 95 between approximate MP 42 and MP 66.
  Duration: Ongoing
     
 