Avenue 3E Bridge Widening Project |
| |
Project No.: |
SS93101C |
| |
Location: |
Avenue 3E in Yuma between Gila Ridge Road and 24th Street |
| |
Contractor: |
Skanska USA Civil West Rocky Mountain District Inc. |
| |
Project Cost: |
$7.7 million |
| |
Scope: |
Project consists of widening and improving the Avenue 3E bridge for the City of Yuma. The new bridge will have six lanes including a median, new pavement, new guardrails and new pedestrian walkways. An additional turning lane will also be built at the eastbound I-8 off-ramp to compliment the new bridge. |
| |
Duration: |
August 2012 – summer 2013 |
| |
|
|
Business Route 8 (4th Avenue) Pavement Preservation Project |
| |
Project No.: |
SS99301C/H799901C |
| |
Location: |
Business Route 8 (4th Avenue) in City of Yuma from state line to Catalina Drive. |
| |
Contractor: |
DPE Construction, Inc. |
| |
Project Cost: |
$3.5 million |
| |
Scope: |
Project consists of removing and replacing approximately three miles of pavement on B8 (4th Avenue) for the City of Yuma. |
| |
Duration: |
April 2013 - August 2013 |
| |
|
|
| |
Interstate 8, MP 66 - 72 Pavement Preservation Project |
| |
Project No.: |
H832601C |
| |
Location: |
Interstate 8 from mileposts 66-72 |
| |
Contractor: |
FANN Contracting, Inc. |
| |
Project Cost: |
$4,960,938.00 |
| |
Scope: |
Project consists of removing and replacing six miles of pavement in Dateland near Exit 67. Project also consists of guardrail work, shoulder build-up and new pavement markings. |
| |
Duration: |
February 2013 - summer 2013 |
| |
|
|
Interstate 10, Bouse Wash Rest Area Rehabilitation |
| |
Project No.: |
H821201C |
| |
Location: |
I-10 at MP 52 in La Paz County |
| |
Contractor: |
Intermountain West Civil Constructors, Inc. |
| |
Project Cost: |
$1 million |
| |
Scope: |
Project consists of rehabilitating the eastbound and westbound Bouse Wash Rest Areas.
*Rest areas closed during construction. |
| |
Duration: |
March 2013 - summer 2013 |
| |
|
|
Interstate 10, Sun Valley Parkway & Wintersburg Traffic Interchanges |
| |
Project No.: |
H800101C |
| |
Location: |
I-10 west of Phoenix (mile posts 98-109) |
| |
Contractor: |
Combs Construction Company, Inc. |
| |
Project Cost: |
$1.3 million |
| |
Scope: |
Project consists of repaving a section both traffic interchanges and exit ramps. Project also consists of repairing deck joints, replacing guardrail and repairing fencing. |
| |
Duration: |
September 2012 – spring 2013 |
| |
|
|
Interstate 10, US 60 to Hovatter Road |
| |
Project No.: |
H853901C |
| |
Location: |
I-10 between MP 32-52 |
| |
Contractor: |
Cholla Pavement Maintenance, Inc. |
| |
Project Cost: |
$507,350.00 |
| |
Scope: |
Project consists of sealing cracks on a 20 mile segment of I-10 east of Quartzsite. |
| |
Duration: |
February 2013 - summer 2013 |
| |
|
|
Juan Sanchez Boulevard, Avenue H - Avenue F |
| |
Project No.: |
SS96901C |
| |
Location: |
Juan Sanchez Blvd. in the City of San Luis between Ave. H and Ave. F |
| |
Contractor: |
Grey Mountain Construction, LLC. |
| |
Project Cost: |
$621,248.00 |
| |
Scope: |
Project consists of removing and replacing approximately two miles of pavement in Yuma County. Project also consists of shoulder build-up and new pavement markings and signage. |
| |
Duration: |
February 2013 - summer 2013 |
| |
|
|
Somerton Avenue Pavement Improvement Project |
| |
Project No.: |
SS90301C |
| |
Location: |
Somerton Ave., in the town of Somerton between 14th Street and County 15th Street |
| |
Contractor: |
Grey Mountain Construction, LLC. |
| |
Project Cost: |
$421,497.00 |
| |
Scope: |
Project consists of removing and replacing the pavement on Somerton Ave. from 14th St. to County 15th St. in Yuma County. Project also consists of new pavement markings. |
| |
Duration: |
February 2013 - summer 2013 |
| |
|
|
Spur to Colorado River Bridge |
| |
Project No.: |
H799801C |
| |
Location: |
3rd Street to State Route 95 (Riverside Drive) in Parker |
| |
Contractor: |
Combs Construction Company, Inc. |
| |
Project Cost: |
$930,000.00 |
| |
Scope: |
Project consists of removing and replacing a section of SR 95 from 3rd Street to Riverside Drive. Additional work also includes replacing driveways, sidewalks and new pavement markings. |
| |
Duration: |
January 2013 – spring 2013 |
| |
|
|
US 95 Pavement Marking Replacement Project |
| |
Project No.: |
SH46101C |
| |
Location: |
US 95 from MP 1-24 |
| |
Contractor: |
Roadsafe Traffic Systems |
| |
Project Cost: |
$287,360.00 |
| |
Scope: |
Project consists of restriping US 95 from San Luis to Yuma. |
| |
Duration: |
April 2013 - summer 2013 |
| |
|
|
|
SR 195 I-8 to US 95 - Design Concept Report
|
|
|
Project No.:
|
195 YU 27 H7043 01L
|
|
|
Location:
|
State Route (SR) 195 between Interstate 8 and US 95 in Yuma
|
|
|
Contractor:
|
The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
|
|
|
Scope:
|
Engineering and environmental studies have been initiated to determine what improvements would be needed.
|
|
|
Duration:
|
2007-2012 |
|
|
|
|
|
US 95 Milepost 42 to Milepost 66 - Design Concept Report
|
|
|
Project No.:
|
095 YU 42 H7022 01L
|
|
|
Location:
|
US 95 between approximate MP 42 and MP 66, located on the U.S. Army Yuma Proving Ground (YPG) in Yuma and La Paz Counties, Arizona.
|
|
|
Contractor:
|
The Arizona Department of Transportation (ADOT) and the Federal Highway Administrations (FHWA)
|
|
|
Project Cost:
|
|
|
|
Scope:
|
An engineering and environmental study is being completed to determine what improvements are needed for the future operation of US 95 between approximate MP 42 and MP 66.
|
|
|
Duration:
|
Ongoing |
|
|
|
|
| |