North Central Projects

State Route 260 from Overgaard to U.S. Route 60

Project Timeline

September 2011
  • Produce the Draft Environmental Assessment.
Late Summer / Early Fall 2011
  • Hold public hearings.
  • Advertise the public meeting.
  • Produce the final Design Concept Report.
January 2012
  • Produce the final study document.