Phoenix Metro Area Projects

U.S. Route 60 (Grand Avenue) and Thunderbird Road / Thompson Ranch Road

Study Documents

Files may be large and take time to download to your computer; Adobe Reader may be needed to view these documents.

The following information is provided as a resource for the US 60 (Grand Avenue) and Thunderbird Road / Thompson Ranch Road Study up to the release of the FONSI.

Public Hearing, May 15, 2014
Winter 2012 Public Scoping
Spring 2012
Final Environmental Assessment
  • Final Environmental Assessment (EA) / Finding of No Significant Impact (FONSI) for the US 60 (Grand Avenue) and Thunderbird / Thompson Ranch Roads Study