Current Status

The project is currently in the final design phase. The project team anticipates selection of a construction contractor for sometime in spring 2016 and construction to begin later that year.

Project Background

The Arizona Department of Transportation and the Federal Highway Administration released the Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the proposed intersection improvements at US 60 (Grand Avenue) and Thunderbird/Thompson Ranch roads. The EA process, which includes both the Draft EA and Final EA, was conducted in accordance with the National Environmental Policy Act and identified a recommended alternative for this intersection.

For more information, email projects@azdot.gov, call 855.712.8530 or write to ADOT Community Relations, 1655 W. Jackson St., MD126F, Phoenix, AZ 85007.

Intersection Improvements

US60_ISO view 2

US60_ISO view 1

US60_ISO view 3

US60_ISO view 4

US60_Streetview1

Comment on the Draft EA

There will be several opportunities to provide comments on the Draft EA, and all comment methods are considered equal. At any time during the 30-day public comment period, comments can be provided in several ways.

  • Public Hearing
    May 15, 2014 | 5-8 p.m.
    Presentation at 5:30 p.m.
    El Mirage Senior Center
    14010 N. El Mirage Rd.
    El Mirage, AZ 85335
  • In writing:
    ADOT Bell and Grand Project Team
    1655 W. Jackson St.
    MD 126F
    Phoenix, AZ 85007
  • Online
  • By email:
    projects@azdot.gov
  • By phone:
    855.712.8530