Archives

Tuesday, February 27, 2018

I-10 at Eloy: A video tour of progress on widening, dust detection system


By Tom Herrmann / ADOT Communications

The signs of progress are unmistakable. About halfway between Phoenix and Tucson, off to the east of Interstate 10 as you pass Eloy, you can see the groundwork for new lanes of I-10 and rebar for the bridges that will be part of a new interchange for I-10 and State Route 87.

Dave Locher, the ADOT resident engineer leading the project, explains in the video above what’s coming between now and October 2019.

“We’re moving dirt in right now, getting ready for the paving for the new westbound lanes. We’re also building two structures where State Route 87 will go over I-10 and the Union Pacific Railroad,” he said.

“At the end of the summer we’ll shift existing westbound traffic onto the new westbound lanes. And then we’ll start to build new eastbound lanes. Toward the end of the project we’ll shift all traffic onto the new lanes.

“Building this freeway offline really is less impactful for the drivers who use this to go back and forth between Tucson and Phoenix. When we open this new road, this section of I-10 will be in a different location. It will be moved to the northeast a few hundred feet and then tie in to the existing lanes.”

The work is part of a $58 million project that also includes widening I-10 to six lanes and creating a first-of-its-kind dust detection zone designed to make the freeway safer for drivers when blowing dust makes it difficult to see the road ahead. Work on the dust detection project will be done as crews build the new eastbound lanes.

“A huge part of this project is to add a dust storm-monitoring program that will detect a dust storm that is coming into this area. It will give us instant message on what drivers can expect,” Locher said.

What will happen once traffic moves to the new lanes?

“One of the last things to get done is we’ll demo the old freeway and you’ll have a brand new intersection where SR 87 and I-10 come together.”

For more on this project, visit azdot.gov/SR87Picacho.
Posted by Caroline Carpenter   |  Labels:  Dust, dust-detection, dust-storm, eloy, I-10-widening, Picacho


Back

The Arizona Ombudsman – Citizens Aide helps you resolve ongoing issues with State Agencies.

Civil Rights

Pursuant to Title VI of the Civil Rights Act of 1964, the Americans with Disabilities Act (ADA) and other nondiscrimination laws and authorities, ADOT does not discriminate on the basis of race, color, national origin, sex, age, or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at civilrightsoffice@azdot.gov. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el Título VI de la Ley de Derechos Civiles de 1964, la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés) y otras normas y leyes antidiscriminatorias, el Departamento de Transporte de Arizona (ADOT) no discrimina por motivos de raza, color, origen nacional, sexo, edad o discapacidad. Las personas que requieran asistencia (dentro de lo razonable) ya sea por el idioma o discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles de ADOT en civilrightsoffice@azdot.gov. Las solicitudes deben hacerse lo más antes posible para asegurar que el Estado tenga la oportunidad de hacer los arreglos necesarios.