US 70 Passing Lane Extension near Cutter

The Arizona Department of Transportation will begin a project to extend an eastbound passing lane along US 70 between Globe and Peridot.  Work will take place between milepost 260 and milepost 262.

Drivers should plan for lane restrictions from January to August 2020.  Motorists can expect shoulder closures, single-lane travel, and flagger stations with possible pilot car operations.

US 70 Passing Lane Project Map

The project includes the following elements:

  • Widening the existing roadway
  • Milling and repaving the existing travel lanes
  • Extending existing culverts

The speed limit within the work zone will be reduced.

Drivers and pedestrians should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.

Traffic Alerts

Schedules are subject to change based on weather and other unforeseen factors. Subscribe  to receive project updates and traffic alerts by email.

For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Globe Area Construction

Traffic Restrictions

US 60 Pinto Creek Bridge

Current Restrictions
  • Mondays through Thursdays - Lane restrictions and flaggers between 6:30 a.m. and 4:30 p.m.
  • Fridays - Lane restrictions and flaggers between 6:30 a.m. and noon
  • No full closures currently planned

US 60 Pavement project between Superior and Top-of-the-World

Current Restrictions
  • Lane restrictions with flaggers/pilot cars primarily Mondays through Thursdays during daylight hours

SR 77 Gila River Bridge

Current Restrictions
  • Bridge restricted to a single lane with traffic controlled by a signal

SR 177 Mineral Creek

Current Restrictions
  • Lane restrictions with flaggers starting in Feb.

US 70 Passing Lane

Current Restrictions
  • Lane restrictions with flaggers