State Route 177 - Mineral Creek Bridge Project

SR 177 Mineral Creek project Map

The Arizona Department of Transportation is rehabilitating the Mineral Creek bridge on State Route 177 northwest of Hayden. Work includes a new concrete overlay, guardrail repairs and scour protection beneath the bridge.

Work is scheduled last just over three months starting in early 2020.

Traffic will be restricted to a single lane in alternating directions, at times, using flaggers. Drivers should expect delays and a vehicle width limit.

Vehicles should proceed through the work zone with caution, slow down and watch for construction personnel and equipment.

Traffic Alerts

Schedules are subject to change based on weather and other unforeseen factors.  Subscribe to receive project updates and traffic alerts by email.

For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Globe Area Construction

Traffic Restrictions

US 60 Pinto Creek Bridge

Current Restrictions
  • Occasional lane restrictions with flaggers are possible weekdays to move equipment or haul material (no long-term restrictions planned)
  • No full closures currently planned

US 60 Pavement project between Superior and Top-of-the-World

Current Restrictions
  • Lane restrictions with flaggers/pilot cars primarily Mondays through Thursdays during daylight hours

SR 77 Gila River Bridge

Current Restrictions
  • Bridge restricted to a single lane with traffic controlled by a signal

  • Expect intermittent 20 minute delays March 23-April 3 for bridge girder placement

SR 177 Mineral Creek

Current Restrictions
  • Lane restrictions with flaggers

US 70 Passing Lane

Current Restrictions
  • Lane restrictions with flaggers