Transportation Studies

Interstate 40 Feasibility Report: Shinarump Drive TI – US 93 (mileposts 43 to 74)

The Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA) have initiated a feasibility study regarding potential improvements along Interstate 40 through Kingman. The study area is:

  • I-40 from Shinarump Drive west of Kingman to just past the US 93/I-40 traffic junction east of Kingman city limits (mileposts 43 to 74)

The purpose of the study is to evaluate different improvement alternatives on I-40 (including passing lane/climbing lane, shoulder improvements and other safety enhancements) and recommend feasible solutions that can improve safety and ease of regional travel by increasing capacity of this stretch of highway.

Study documents will be posted to the site after the April 26 public information meeting. 

April 26, 2017 Public Meeting

The Arizona Ombudsman – Citizens Aide helps citizens to resolve ongoing issues with State Agencies.

Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at civilrightsoffice@azdot.gov. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles en civilrightsoffice@azdot.gov. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.