Starting late summer 2021, the Arizona Department of Transportation (ADOT) will begin performing needed work on unstable rock-wall faces at two locations along State Route 89A in Oak Creek Canyon, between Flagstaff and Sedona. The project, a critical safety-related priority for ADOT, will require lane restrictions and temporary closures.

Public Information Meeting

ADOT invites you to participate in a live, call-in/online public information meeting to learn more about the SR 89A Oak Creek Canyon Rockfall Mitigation Project and ask questions. The contractor for the project will participate in the meeting and be available to discuss the restrictions and planned closures. The meeting is scheduled for 6 p.m. Thursday, Aug. 19, 2021.

Join Online
By Phone: 1.408.418.9388
Meeting Number: 146 876 2883
Password: SR89A

What to Expect

Construction activities at the southern work zone (milepost 375) will include rock blasting, manually removing loose rocks from the slopes, and drilling and rock-bolt installation. Activities at the northern work zone (milepost 389) will include removing loose rocks from the slopes and drilling and rock-bolt installation. The project is scheduled to be completed late spring 2022, depending upon weather and other unforeseen factors.

SR 89A Oak Creek Rockfall Map

SR 89A Oak Creek Rockfall 1

SR 89A Oak Creek Rockfall 2

 
  • Six (6) daytime closures of SR 89A north of the Sedona city limits (MP 375) from 8 a.m. to 2 p.m. on Tuesdays and Thursdays. The specific closure dates will be provided at the public meeting.
  • Ten (10) overnight closures of SR 89A north of Pumphouse Wash Bridge (MP 389) from 9 p.m. to 6 a.m. Sunday nights through Friday mornings. The specific closure dates will be provided at the public meeting.
  • Restriction of SR 89A to one lane only of alternating north- and southbound travel in each work zone. The restrictions are tentatively scheduled for weekdays during daytime hours and will occur intermittently throughout the project.
  • No traffic-control restrictions on weekends (Saturdays and Sundays).
  • Emergency responders will have access throughout the canyon during planned closures.

Other Upcoming Projects

Two other ADOT projects—one at the Y Roundabout at the junction of SR 89A and SR 179 in Sedona and the other on SR 179 between Interstate 17 and Red Rock Vista—will partially overlap with the rockfall mitigation project. To help minimize traffic disruptions, work at the Y Roundabout will be limited to overnight hours only.

  • In addition, the Pumphouse Wash Bridge and Oak Creek Canyon Drainage and Sediment Control projects are planned to begin on SR 89A in spring 2022. These projects will also require lane restrictions and temporary closures. ADOT will provide more information on these projects prior to construction.

Stay Informed!

  • By email: Subscribe to receive project updates and traffic alerts.
  • By phone:  Call the ADOT Bilingual Project Information Line at 855.712.8530.
  • Online: Submit a question or comment through the ADOT website. Visit azdot.gov/Contact and then select Projects from the dropdown menu.
  • Twitter:  Follow ADOT on Twitter  (@ArizonaDOT) for real-time highway conditions statewide.