Interstate 10 Tyson Wash Bridges Spot Repair and Scour Retrofit, Quartzsite

Overview

The Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA) are replacing four existing bridge joints on the eastbound and westbound Interstate 10 Tyson Wash Bridges, located in the Quartzite town limits.

The Tyson wash is one of the largest washes running through the town of Quartzsite.

The work will consist of repairing the bridge joints at the bridge decks in order to smooth the bridge deck transitions and to construct an erosion prevention system, which will provide protection of the bridge structures in a major flood event. 

The project is scheduled to begin in August 2020 with completion anticipated in late December 2020.

Project Area

The project area is on Interstate 10 between mileposts 18 and 19 within the Quartzsite town limits.

I-10 Tyson Wash Bridge project Map

What to expect:

The majority of construction is scheduled to occur underneath the bridges requiring minimal traffic impacts to Interstate 10.

Drivers are asked to use caution, obey posted speed limits and traffic control devices and use caution around construction personnel and equipment.

Stay Informed

Schedules are subject to change based on weather and other unforeseen factors. Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or submit a question or comment by email.  For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.