US 95: Mileposts 67 to 80 Pavement Life Extension

Overview 

The Arizona Department of Transportation (ADOT) repaired the pavement on US 95 between mileposts 67 and 80, located between Yuma and Quartzsite. The work consisted of placing a hot chip seal coat, followed by micro-surfacing. Additional road work also included spot repair work with new asphalt concrete, replacing pavement markings and other miscellaneous work. 

What to Expect 

Construction was completed in March 2023.

Project Area 

The project is located on US 95 between mileposts 67 and 80, and between Yuma and La Paz counties. 

US 95: Mileposts 67 to 80 Pavement Life Extension project map

 

Stay Informed

Schedules are subject to change based on weather and other unforeseen factors.  Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or submit a question or comment by email.  For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.