US 95, Wellton Mohawk Canal-Imperial Dam Road Pavement Preservation

The Arizona Department of Transportation and Federal Highway Administration are repairing the pavement on US 95, north of the Wellton-Mohawk Canal in Yuma County.
The project consists of milling the existing pavement surface and replacing it with new asphalt concrete. Additional work includes pavement marking and other related work.

The proposed area is located in Yuma County on US 95 between milepost 38 (near Wellton/Mohawk Canal) and Imperial Dam Road (milepost 44.34).

Project Area

Project Map

 

What to Expect

The project is scheduled to begin spring 2022 with completion anticipated summer 2022.
Drivers are asked to use caution, obey posted speed limits and traffic control devices and use caution around construction personnel and equipment.

 

Stay Informed

Schedules are subject to change based on weather and other unforeseen factors.  Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or submit a question or comment by email.  For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.