Skip to main content
Alert icon

Update: Plan for continued lane restrictions on north- and southbound US 95 in Yuma through November

Learn more

This alert updates the time and date of nighttime heavy machinery operations

The Arizona Department of Transportation advises motorists to plan for continued 24/7 lane restrictions along north- and southbound US 95 in Yuma through November as crews construct new roundabouts at the Imperial Dam and Aberdeen Road intersections.

Motorists can expect the following around-the-clock restrictions:

  • North- and southbound US 95 will be narrowed to one lane in each direction between Imperial Dam Road and Aberdeen Road.
    • Note: Heavy machinery and crews will be active nightly from 6 p.m to 5 a.m. Monday, Sept. 14, through Thursday, Sept. 17. This overnight work may cause brief delays when heavy machinery requires access to turn around on the roadway. Flaggers and DPS troopers will be present to direct traffic through the worksite. Crews will also be conducting dirt work during the daytime hours. 
  • The speed limit will be reduced to 25 mph.

Delays are likely, so allow extra travel time. Proceed through the work zone with caution, slow down and watch for construction and law enforcement personnel and equipment.

Show less

US 95, Imperial Dam Road to Aberdeen Road Intersection Improvements

US 95, Imperial Dam Road to Aberdeen Road Intersection Improvements

Contents

Overview

The Arizona Department of Transportation began an improvement project at the US 95 intersection between Imperial Dam Road and Aberdeen Road, north of Yuma.

Project Elements

  • Construct two new roundabouts at Imperial Dam and Aberdeen roads and widen the Martinez Lake Road intersection
  • Drainage Improvements
  • Pavement Rehabilitation
  • Install new pavement markings and signage
  • Install new barbed wire wildlife fencing

Project Schedule

The project began February 2026.

Delays and lane restrictions on US 95 are expected. ADOT will provide advance notice of restrictions and closures to email subscribers.

Project Area Map

Click map to enlargeShelby Drive Business Development Phase 2 Map

Stay Informed

More information Icon
  • Email: Subscribe to receive project updates and traffic alerts.
  • By Phone: Call the ADOT Bilingual Project Information Line at 855.712.8530.
  • Online: Submit a question or comment through the ADOT website at [email protected]
  • Twitter: Follow ADOT on Twitter (@ArizonaDOT) for real-time highway conditions statewide.

Schedules are subject to change based on weather and other unforeseen factors. Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or submit a question or comment by email. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.