I-17 101 traffic interchange

Roundabout work on US 93 in Wickenburg begins May 5

Roundabout work on US 93 in Wickenburg begins May 5

April 29, 2013

PHOENIX — The Arizona Department of Transportation will mill the concrete surface at the roundabouts in Wickenburg on US 93 starting the night of Sunday, May 5 between 7 p.m. and 6 a.m. Work will begin on the south roundabout first and then crews will proceed to the north roundabout. One lane will be restricted in each direction and delays of up to 30 minutes are expected.

Once the concrete work is completed on Sunday night, crews will begin to restripe the roadway at the roundabouts starting Monday, May 6 and continue through Wednesday, May 8 between 6 a.m. and 6 p.m.

Northbound US 93 traffic will be directed to use the north roundabout to Tegner Street for access into Wickenburg. Southbound US 93 traffic will be directed through the work zone with flaggers, onto Tegner Street to southbound US 60.

Restrictions for wide loads (maximum 10 feet wide) and a 75-foot length restriction will be in place until the work is completed.

Clearly marked detour signage will be in place to direct traffic around the work zone. ADOT advises drivers to proceed through the work zone with caution, slow down, and be alert for construction equipment and personnel.

For more information, email [email protected] or call the ADOT project hotline at 1.855.712.8530. Visit facebook or our website for more information about ADOT. For more information about ADOT projects and programs across Arizona see the agency's latest blog posts.