Skip to main content

Custom Alert placed in Alerts region

East- and westbound lane restrictions scheduled to begin Nov. 17

State Route 82: San Pedro River Bridge (mileposts 60-61) Replacement Project Project area map

The Arizona Department of Transportation advises drivers to plan for lane restrictions on State Route 82 at the San Pedro River bridge, located near the Fairbank Historic Townsite in Cochise County (mileposts 61 to 62), from 5 a.m. to 5 p.m. starting Tuesday, Nov. 17, through the end of July 2027, as crews work on a bridge replacement project.

Drivers can expect the following restrictions:

  • East- and westbound SR 82 to be narrowed to one lane with stop-and-go traffic from 5 a.m. to 5 p.m. starting Tuesday, Nov. 17, and continuing into December.
    • Note: Drivers of oversized loads should use state routes 90 and 80 as alternate routes.
  • Flaggers will direct traffic through the construction zone.
  • The speed limit will be reduced to 25 mph.
  • A 12-foot vehicle width restriction will be in effect.

Note: Beginning in early December, temporary traffic signals at both ends of the bridge will control traffic while construction crews work on one side of the bridge at a time.

ADOT advises motorists to allow extra travel time, slow down, and exercise caution when approaching and traveling through all work zones.

For more information and to sign up for email alerts, visit: azdot.gov/SR82SanPedroRiverBridge.