Bulletins
Bridge Construction Bulletins, by year.
2020
2019
Bulletin | Issue Date | Subject |
---|---|---|
2019-1 | Feb. 28, 2018 | Traffic Signals and Lighting, and Sign Structures Standards and Specifications |
2019-2 | Nov. 5, 2019 | ADOT MASH Barriers Standards Drawings |
2018
Bulletin | Issue Date | Subject |
---|---|---|
2018-1 | Feb. 28, 2018 | SD 1.01 F-Shape Bridge Concrete Barrier and Transition (34") SD 1.02 F-Shape Bridge Concrete Barrier and Transition (44") SD 1.06-1 Two Tube Bridge Rail (1 of 4) SD 1.06-2 Two Tube Bridge Rail (2 of 4) SD 1.06-3 Two Tube Bridge Rail (3 of 4) SD 1.06-4 Two Tube Bridge Rail (4 of 4) |
2016
Bulletin | Issue Date | Subject |
---|---|---|
2016-1 | Jul. 19, 2016 | Section 5: Concrete Structures Section 6: Steel Structures |
2015
2013
Bulletin | Issue Date | Subject |
---|---|---|
2013-1 | Jan. 23, 2013 | SD 8.02-1 Sound Barrier Wall (Masonry) SD 8.02-2 Sound Barrier Wall (Masonry) |
2013-2 | Sep. 10, 2013 |
AASHTO LRFD Bridge Design Specifications, |
2012
Bulletin | Issue Date | Subject |
---|---|---|
2012-5 | Dec. 18, 2012 | ADOT Bridge Load Rating Guidelines |
2012-4 | Nov. 14, 2012 | Structural Excavation and Structure Backfill SD 5.01 thru 5.02 |
2012-3 | July 11, 2012 | Pipe Culvert Headwalls SD 6.30 thru 6.36 |
2012-2 | June 21, 2012 | SD 1.01 SD 1.02 |
2012-1 | Feb. 2, 2012 | Reinforced Concrete Box Culverts SD 6.01 thru 6.11 |
2011
Bulletin | Issue Date | Subject |
---|---|---|
2011-3 | Aug. 26, 2011 | ADOT Bridge Design Guidelines |
2011-2 | July 18, 2011 | ADOT Bridge Inspection Guidelines |
2011-1 | March 3, 2011 | SD 9.10 (1 thru 5) Tubular Sign Structures (Tubular Cantilever) SD 9.20 (1 thru 5) Tubular Sign Structures (Tubular Frame) |
2010
Bulletin | Issue Date | Subject |
---|---|---|
2010-2 | Sept. 28, 2010 | SD 7.01-1 Retaining Wall (Reinf. Concrete Cantilever) SD 7.01-2 Retaining Wall (Reinf. Concrete Cantilever) SD 7.01-3 Retaining Wall (Reinf. Concrete Cantilever) SD 7.01-4 Retaining Wall (Reinf. Concrete Cantilever) SD 7.01-5 Retaining Wall (Reinf. Concrete Cantilever) SD 7.02-1 Retaining Wall (Masonry Cantilever) SD 7.02-2 Retaining Wall (Masonry Cantilever) |
2010-1 | April 6, 2010 | SD 1.11 Barrier Junction Box SD 8.01 Sound Barrier Wall (Concrete) SD 8.02-1 Sound Barrier Wall (Masonry) SD 8.02-2 Sound Barrier Wall (Masonry) |
2009
Bulletin | Issue Date | Subject |
---|---|---|
2009-4 | Dec. 17, 2009 | SD 3.02 Deck Joint Assembly Strip Seal SD 3.03 Deck Joint Assembly Raised Strip Seal |
2009-3 | Sept. 23, 2009 | SD 2.04 Slope Paving Details SD 2.05 Deleted (no longer needed) |
2009-2 | June 16, 2009 | SD 3.01 Deck Joint Assembly Compression Seal SD 1.06-1 Two Tube Bridge Rail SD 1.06-2 Two Tube Bridge Rail SD 1.06-3 Two Tube Bridge Rail SD 1.06-4 Two Tube Bridge Rail |
2009-1 | March 24, 2009 | SD 1.01 F-Shape Bridge Concrete Barrier and Transition (32") Nominal SD 1.02 F-Shape Bridge Concrete Barrier and Transition (42") Nominal SD 1.04 Combination Pedestrian-Traffic Bridge Railing SD 1.05 Pedestrian Fence for Bridge Railing SD 1.04 |
2008
Bulletin | Issue Date | Subject |
---|---|---|
2008-2 | July 22, 2008 | ADOT Bridge Design Guidelines - Section 14 - Joints and Bearings |
2008-1 | Feb. 11, 2008 | Rule Change by the Arizona Board of Technical Registration |
2007
Bulletin | Issue Date | Subject |
---|---|---|
2007-9 | Dec. 12, 2007 | SD 2.01 Approach Slab Details SD 2.02 Type 1 Anchor Slab Details SD 2.03 Type 2 Anchor Slab Details |
2007-8 | Dec. 4, 2007 | Update to Minimal Vertical Clearance in Bridge Practice Guidelines |
2007-7 | Nov. 29, 2007 | SD 1.01 32 Inch F-Shape Bridge Concrete Barrier And Transition SD 1.02 42 Inch F-Shape Bridge Concrete Barrier And Transition SD 1.03 Thrie Beam Guard Rail Transition System |
2007-6 | Nov. 1, 2007 | ADOT Bridge Hydraulics Guidelines |
2007-5 | May 23, 2007 | SD 9.52 Dynamic Message Sign, Tubular Frame |
2007-4 | May 10, 2007 | Bridge Group Electronic Inventory of State Bridges |
2007-3 | Feb. 12, 2007 | SD 8.01 Sound barrier wall (concrete) SD 8.02 Sheet 1 of 2 Sound Barrier Wall (Masonry) SD 8.02 Sheet 2 of 2 Sound Barrier Wall (Masonry) |
2007-2 | Jan. 11, 2007 | Revised Bridge Group Standard Plan Sheet Microstation v8 Resources |
2007-1 | Jan. 11, 2007 | AASHTO LRFD Bridge Design Specifications, 4th Edition |
2006
Bulletin | Issue Date | Subject |
---|---|---|
2006-1 | Oct. 4, 2006 | ADOT Draft Bridge Design Guidelines (LRFD) |
2005
Bulletin | Issue Date | Subject |
---|---|---|
2005-5 | Nov. 15, 2005 | SD 8.02 Sheet 1 of 2 Sound Barrier Wall (Masonry) SD 8.02 Sheet 2 of 2 Sound Barrier Wall (Masonry) |
2005-4 | Aug. 10, 2005 | AASHTO LRFD Bridge Design Specifications - 3rd Edition - 2005 Interim Revisions |
2005-3 | March 23, 2005 | Errata AASHTO 17th Edition |
2005-2 | March 18, 2005 | SD 1.03 Thrie Beam Guardrail Transition System SD 9.01 Median Sign Structure (Two Sided): Sheet 1 SD 9.02 Median Sign Structure (One Sided): Sheet 1 |
2005-1 | March 18, 2005 | Bridge Practice Guidelines |