Construction Standard Drawings
Construction Standard Drawings
Current Design Construction Standard Drawings
The current Roadway Design Construction Standard Drawings listed below should be used in conjunction with the Roadway Design Memorandums, Roadway Design Guidelines and Barrier Design Information.
It is the responsibility of users to make sure they are using current design standards
Current Roadway Design Construction Standard Drawings
The Construction Standards Index Sheets are available on the Roadway CADD Standards page under the Construction Standards Index Sheets: 1A, 1B, 1C and 1D section.
Combined set of current Standard Drawings
Drawing Number | Drawing Name | Revision Date |
---|---|---|
C-01.10, Sht. 1 | Symbol Legend | May 2012 |
C-01.10, Sht. 2 | Symbol Legend | May 2012 |
C-01.10, Sht. 3 | Symbol Legend | May 2012 |
C-01.10, Sht. 4 | Symbol Legend | May 2012 |
C-01.30, Sht. 1 | General Abbreviations | Dec. 2017 |
C-01.30, Sht. 2 | General Abbreviations | May 2012 |
C-01.30, Sht. 3 | General Abbreviations | May 2012 |
C-02.10 | Slopes, Rural Divided Highways | May 2012 |
C-02.20 | Slopes, Rural Undivided and Fringe-Urban Highways | May 2012 |
C-02.30 | Slopes, Miscellaneous Roadways | May 2012 |
C-03.10, Sht. 1 | Ditches, Channels, Dikes and Berms, Ditches and Channels | May 2012 |
C-03.10, Sht. 2 | Ditches, Channels, Dikes and Berms, Dikes | May 2012 |
C-03.10, Sht. 3 | Ditches, Channels, Dikes and Berms, Ditch Dike | May 2012 |
C-03.10, Sht. 4 | Ditches, Channels, Dikes and Berms, Pipe Berms | May 2012 |
C-03.10, Sht. 5 | Ditches, Channels, Dikes and Berms, Headwall Berms | May 2012 |
C-04.10, Sht. 1 | Spillway, Embankment, Single Inlet | Dec. 2017 |
C-04.10, Sht. 2 | Spillway, Embankment, Double Inlet | Dec. 2017 |
C-04.20, Sht. 1 | Downdrain, Embankment, Single Inlet | Dec. 2017 |
C-04.20, Sht. 2 | Downdrain, Embankment, Double Inlet | Dec. 2017 |
C-04.30 | Spillway Length Table | Dec. 2017 |
C-04.40 | Downdrain Length Table | Dec. 2017 |
C-04.50 | Downdrain Energy Dissipator | May 2012 |
C-05.10 | Curb & Gutter, Curb, Gutter | May 2012 |
C-05.12, Sht. 1 | Curb & Gutter Transitions | May 2012 |
C-05.12, Sht. 2 | Curb & Gutter Transitions | May 2012 |
C-05.12, Sht. 3 | Curb & Gutter Transitions | May 2012 |
C-05.20, Sht. 1 | Concrete Driveways and Sidewalks, Driveways | May 2012 |
C-05.20, Sht. 2 | Concrete Driveways and Sidewalks, Sidewalks | May 2012 |
C-05.30, Sht. 1 | Sidewalk Ramp, Type A | May 2012 |
C-05.30, Sht. 2 | Sidewalk Ramp, Type B | May 2012 |
C-05.30, Sht. 3 | Sidewalk Ramp, Type C | May 2012 |
C-05.30, Sht. 4 | Sidewalk Ramp, Type D | May 2012 |
C-05.30, Sht. 5 | Sidewalk Ramp, Type E | May 2012 |
C-05.30, Sht. 6 | Sidewalk Ramp, Type F | May 2012 |
C-05.30, Sht. 7 | Sidewalk Ramp, Detectable Warning Strip | May 2012 |
C-05.40 | Median Paving and Nose | May 2012 |
C-05.50 | Concrete Bus Bay | May 2012 |
C-06.10, Sht. 1 | Driveway & Turnout Layouts | May 2012 |
C-06.10, Sht. 2 | Driveway & Turnout Layouts | May 2012 |
C-07.01, Sht. 1 | PCCP Joints | May 2012 |
C-07.01, Sht. 2 | PCCP Joints | May 2012 |
C-07.02 | Load Transfer Dowel Assembly | May 2012 |
C-07.03, Sht. 1 | PCCP Joint Locations, Mainline Skewed Joints | May 2012 |
C-07.03, Sht. 2 | PCCP Joint Locations, Mainline Skewed Joints | May 2012 |
C-07.03, Sht. 3 | PCCP Joint Locations, Mainline Skewed Joints | May 2012 |
C-07.03, Sht. 4 | PCCP Joint Locations, Mainline Skewed Joints | May 2012 |
C-07.03, Sht. 5 | PCCP Joint Locations, Mainline Non-Skewed Joints | May 2012 |
C-07.03, Sht. 6 | PCCP Joint Locations, Mainline Non-Skewed Joints | May 2012 |
C-07.03, Sht. 7 | PCCP Joint Locations, Mainline Non-Skewed Joints | May 2012 |
C-07.03, Sht. 8 | PCCP Joint Locations, Mainline Non-Skewed Joints | May 2012 |
C-07.04, Sht. 1 | PCCP Joint Locations, Parallel-Type Entrance Ramp with Auxiliary Lane | May 2012 |
C-07.04, Sht. 2 | PCCP Joint Locations, Parallel-Type Exit Ramp with Auxiliary Lane | May 2012 |
C-07.04, Sht. 3 | PCCP Joint Locations, Taper-Type Entrance Ramp | May 2012 |
C-07.04, Sht. 4 | PCCP Joint Locations, Taper-Type Exit Ramp | May 2012 |
C-07.04, Sht. 5 | PCCP Joint Locations, Crossroad and Ramp Termini | May 2012 |
C-07.06 | Trench Backfill and Pavement Replacement | Aug 2021 |
C-08.20 | Paved Gore Area | May 2012 |
C-10.00 | Guardrail Measurement Limits | Dec. 2017 |
C-10.01 | Guardrail Installation | Dec. 2017 |
C-10.03 | W-Beam Guardrail, MGS Blocked-Out Timber Post | Dec. 2017 |
C-10.04 | W-Beam Guardrail, MGS Blocked-Out Steel Post | Dec. 2017 |
C-10.05, Sht. 1 | W-Beam Guardrail, (Modified) with Freeway Curb and Gutter | Dec. 2017 |
C-10.05, Sht. 2 | W-Beam Guardrail, (Modified) with Freeway Curb and Gutter | Dec. 2017 |
C-10.06 | W-Beam Guardrail, Long Span | Dec. 2017 |
C-10.07, Sht. 1 | W-Beam Guardrail, Box Culvert Guardrail Post | Dec. 2017 |
C-10.07, Sht. 2 | W-Beam Guardrail, Box Culvert Guardrail Post | Dec. 2017 |
C-10.08 Sht. 1 | W-Beam Guardrail, End Anchor | Dec. 2017 |
C-10.08, Sht. 2 | W-Beam Guardrail, End Anchor | Dec. 2017 |
C-10.09 | Guardrail Post Rock Installation | Dec. 2017 |
C-10.20, Sht. 1 | Guardrail End Terminal Pad Layout for SoftStop | Apr. 2019 |
C-10.20, Sht. 2 | Guardrail End Terminal Pad Layout for SoftStop | Apr. 2019 |
C-10.21, Sht. 1 | Guardrail End Terminal Pad Layout for MSKT | Apr. 2019 |
C-10.21, Sht. 2 | Guardrail End Terminal Pad Layout for MSKT | Apr. 2019 |
C-10.22, Sht. 1 | Guardrail End Terminal Pad Layout for MAX-Tension | Apr. 2019 |
C-10.22, Sht. 2 | Guardrail End Terminal Pad Layout for MAX-Tension | Apr. 2019 |
C-10.23, Sht. 1 | Guardrail End Terminal Pad Layout for SGET | Apr. 2021 |
C-10.23, Sht. 2 | Guardrail End Terminal Pad Layout for SGET | Apr. 2021 |
C-10.26, Sht. 1 | Guardrail End Terminal Pad Layout for MFLEAT | Nov. 2019 |
C-10.26, Sht. 2 | Guardrail End Terminal Pad Layout for MFLEAT | Nov. 2019 |
C-10.30, Sht. 1 | Guardrail Transition, to Concrete Barrier, Timber Post | Dec. 2017 |
C-10.30, Sht. 2 | Guardrail Transition, to Concrete Barrier, Timber Post | Dec. 2017 |
C-10.31, Sht. 1 | Guardrail Transition to Concrete Barrier, Steel Post | Dec. 2017 |
C-10.31, Sht. 2 | Guardrail Transition to Concrete Barrier, Steel Post | Dec. 2017 |
C-10.38, Sht. 1 | Guardrail Taper, G4 to MGS W-Beam with Staggered Post | Dec., 2017 |
C-10.38, Sht. 2 | Guardrail Taper, G4 to MGS W-Beam with Offset Rail | Dec. 2017 |
C-10.40 | Concrete Median Barrier, 32" Type 'F', Cast-In-Place | Dec. 2017 |
C-10.41 | Concrete Median Barrier, 42" Type 'F', Cast-In-Place | Dec. 2017 |
C-10.44, Sht. 1 | Concrete Median Barrier, 42" Type 'F', with Variable Height Sides, H=0” to 26” | Dec. 2017 |
C-10.44, Sht. 2 | Concrete Median Barrier, 42" Type 'F', with Variable Height Sides, H=0” to 26” | Dec. 2017 |
C-10.45, Sht. 1 | Concrete Median Barrier, 42" Type 'F', with Variable Height Sides, H=26” to 60” | Dec. 2017 |
C-10.45, Sht. 2 | Concrete Median Barrier, 42" Type 'F', with Variable Height Sides, H=26” to 60” | Dec. 2017 |
C-10.50, Sht. 1 | Concrete Half Barrier, 32" Type 'F', Cast-In-Place | Dec. 2017 |
C-10.50, Sht. 2 | Concrete Half Barrier, 32" Type 'F', Precast | Dec. 2017 |
C-10.51 | Concrete Half Barrier, 32" Type 'F' with Sidewalk | Dec. 2017 |
C-10.52 | Concrete Half Barrier, 32" Type 'F' with Gutter | Dec. 2017 |
C-10.53 | Concrete Half Barrier, 42" Type 'F' with Gutter | Dec. 2017 |
C-10.54, Sht. 1 | Concrete Half Barrier, 32" Type 'F' at Piers, Cast-In-Place | Dec. 2017 |
C-10.54, Sht. 2 | Concrete Half Barrier, 32" Type 'F' at Piers, Precast | Dec. 2017 |
C-10.54, Sht. 3 | Concrete Half Barrier, 32" Type 'F' at Piers, Layout | Dec. 2017 |
C-10.55, Sht. 1 | Concrete Half Barrier, 42" Type 'F' at Piers, Cast-In-Place | Dec. 2017 |
C-10.55, Sht. 2 | Concrete Half Barrier, 42" Type 'F' at Piers, Precast | Dec. 2017 |
C-10.55, Sht. 3 | Concrete Half Barrier, 42" Type 'F' at Piers, Layout | Dec. 2017 |
C-10.70, Sht. 1 | Concrete Half-Barrier Transition to Vertical, 32" Type 'F' with Caissons | Dec. 2017 |
C-10.70, Sht. 2 | Concrete Half-Barrier Transition to Vertical, 32" Type 'F' with Caissons | Dec. 2017 |
C-10.70, Sht. 3 | Concrete Half-Barrier Transition to Vertical, 32" Type 'F' with Caissons | Dec. 2017 |
C-10.71, Sht. 1 | Concrete Half-Barrier Transition to Vertical, 32" Type 'F' with Curb and Gutter | Dec. 2017 |
C-10.71, Sht. 2 | Concrete Half-Barrier Transition to Vertical, 32" Type 'F' with Curb and Gutter | Dec. 2017 |
C-10.72, Sht. 1 | Concrete Half-Barrier Transition, 42" to 32" Type 'F' with Caissons | Dec. 2017 |
C-10.72, Sht. 2 | Concrete Half-Barrier Transition to Vertical, 42" to 32" Type 'F' with Caissons | Dec. 2017 |
C-10.72, Sht. 3 | Concrete Half-Barrier Transition to Vertical, 42" to 32" Type 'F' with Caissons | Dec. 2017 |
C-10.73, Sht. 1 | Concrete Half-Barrier Transition to Vertical, 42" Type 'F' with Gutter | Dec. 2017 |
C-10.73, Sht. 2 | Concrete Half-Barrier Transition to Vertical, 42" Type 'F' with Gutter | Dec. 2017 |
C-10.74 | Concrete Half-Barrier Transition, 42" to 32" Type 'F' | Dec. 2017 |
C-10.75, Sht. 1 | Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 1 | Dec. 2017 |
C-10.75, Sht. 2 | Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 2 | Dec. 2017 |
C-10.76 | Concrete Half-Barrier Transition, Type 'F' at Radius, 32" to 0" | Dec. 2017 |
C-10.77 | Concrete Barrier Transition to Guardrail End Terminal Layout with Curb | April 2019 |
C-10.78 | Concrete Half-Barrier Transition, 32" Type 'F' Low Speed Approach | Dec. 2017 |
C-10.79 | Concrete Half-Barrier Transition, 42" Type 'F' Tangent Departure | Dec. 2017 |
C-11.10, Sht. 1 | Roadway Cattle Guard | May 2012 |
C-11.10, Sht. 2 | Roadway Cattle Guard | May 2012 |
C-11.10, Sht. 3 | Roadway Cattle Guard | May 2012 |
C-11.10, Sht. 4 | Roadway Cattle Guard | May 2012 |
C-11.20 | Cattle Guard, Drainage | May 2012 |
C-12.10, Sht. 1 | Fence, Woven Wire | May 2012 |
C-12.10, Sht. 2 | Fence, Barbed Wire | May 2012 |
C-12.10, Sht. 3 | Fence, Type 1 and 2 Gates, Flood Gate | May 2012 |
C-12.10, Sht. 4 | Fence, Flood Gate Installation | May 2012 |
C-12.10, Sht. 5 | Fence, Miscellaneous Details | May 2012 |
C-12.20, Sht. 1 | Fence, Chain Link, Type 1 | May 2012 |
C-12.20, Sht. 2 | Fence, Chain Link, Type 2 | May 2012 |
C-12.20, Sht. 3 | Fence, Chain Link, Gates | May 2012 |
C-12.30, Sht. 1 | Fence, Chain Link Cable Barrier | May 2012 |
C-12.30, Sht. 2 | Fence, Chain Link Cable Barrier | May 2012 |
C-12.30, Sht. 3 | Fence, Chain Link Cable Barrier | May 2012 |
C-13.10, Sht. 1 | Pipe Culvert Installation | May 2012 |
C-13.10, Sht. 2 | Pipe Culvert Installation | May 2012 |
C-13.15 | Typical Pipe Installation | Aug. 2023 |
C-13.20 | Pipe, Reinforced Concrete End Section | May 2012 |
C-13.25 | Pipe, Corrugated Metal End Section | May 2012 |
C-13.30 | Pipe and Pipe Arch, Corrugated Metal, Concrete Invert Paving | May 2012 |
C-13.55 | Pipe, Cattle/Vehicle Pass, Mitered End Treatment | May 2012 |
C-13.60 | Slotted Drain Details | May 2012 |
C-13.65 | Slotted Drain Installation Details | May 2012 |
C-13.70 | Storm Drain Connection Details | May 2012 |
C-13.75 | Storm Drain Outlet Barrier Gate | May 2012 |
C-13.76 | Storm Drain Outlet and Storm Drain Plug | May 2012 |
C-13.80 | Pipe Collar Details | May 2012 |
C-15.10 | Catch Basin, Type 1 | May 2012 |
C-15.20, Sht. 1 | Catch Basin, Type 3 | May 2012 |
C-15.20, Sht. 2 | Catch Basin, Type 3 | May 2012 |
C-15.20, Sht. 3 | Catch Basin Access Frame and Cover Details | May 2012 |
C-15.30 | Catch Basin, Type 4 | May 2012 |
C-15.40, Sht. 1 | Catch Basin, Type 5 | May 2012 |
C-15.40, Sht. 2 | Catch Basin, Type 5 | May 2012 |
C-15.50 | Catch Basin, Frame and Grate | May 2012 |
C-15.70, Sht. 1 | Catch Basin, Miscellaneous Details | May 2012 |
C-15.70, Sht. 2 | Catch Basin, Miscellaneous Details | May 2012 |
C-15.75 | Catch Basin, Drop Inlet | May 2012 |
C-15.80 | Catch Basin, Flush | May 2012 |
C-15.81 | Catch Basin, Side Slope | May 2012 |
C-15.90 | Catch Basin, Median Dike, Precast | May 2012 |
C-15.91, Sht. 1 | Freeway Catch Basin Details | May 2012 |
C-15.91, Sht. 2 | Freeway Catch Basin Details | May 2012 |
C-15.92, Sht. 1 | Catch Basin with Type 'F' Concrete Half Barrier | May 2012 |
C-15.92, Sht. 2 | Catch Basin with Type 'F' Concrete Half Barrier | May 2012 |
C-16.40 | Irrigation Sleeves | May 2012 |
C-17.10 | Rail Bank Protection for Drainageways, Types 1, 2 & 3 | May 2012 |
C-17.15 | Rail Bank Protection at Abutments, Types 4, 5 & 6 | May 2012 |
C-17.20 | Rail Bank Protection for Drainageways, Types 7, 8 & 9 | May 2012 |
C-18.10, Sht. 1 | Manhole Riser Details | May 2012 |
C-18.10, Sht. 2 | Manhole Base Details, Normal Installation | May 2012 |
C-18.10, Sht. 3 | Manhole Frame and Cover Details | May 2012 |
C-19.10, Sht. 1 | Ford Concrete Walls | May 2012 |
C-19.10, Sht. 2 | Ford, Types 1 and 2 | May 2012 |
C-21.10 | Survey Monument Frame and Cover | May 2012 |
C-21.20 | Survey Marker | May 2012 |
Superseded Construction Standard Drawings
Construction Standard Drawings that have been updated or deleted after May 2012 are listed below. Older superseded drawings are listed under Historical Construction Standard Drawings
Drawing Number | Drawing Name | Revision Date |
---|---|---|
C-01.30, Sht. 1 | General Abbreviations, 1 of 3 | May, 2012 |
C-04.10, Sht. 1 | Spillway, Embankment, Single Inlet, 1 of 2 | May, 2012 |
C-04.10, Sht. 2 | Spillway, Embankment, Double Inlet, 2 of 2 | May, 2012 |
C-04.20, Sht. 1 | Downdrain, Embankment, Single Inlet, 1 of 2 | May, 2012 |
C-04.20, Sht. 2 | Downdrain, Embankment, Single Inlet, 2 of 2 | May, 2012 |
C-04.30 | Spillway Length Table | May, 2012 |
C-04.40 | Downdrain Length Table | May, 2012 |
C-10.00 | Guardrail Measurement Limits | May, 2012 |
C-10.01 | Guardrail Installation, Type A And Reflector Tab | May, 2012 |
C-10.02 | Guardrail Installation, Type B And Reflector Tab | May, 2012 |
C-10.03 | W-Beam Guardrail, G4(1W) And G4(2W) Blocked-Out Timber Post | May, 2012 |
C-10.04 | W-Beam Guardrail, G4(1S) Blocked-Out Steel Post | May, 2012 |
C-10.05, Sht. 1 | W-Beam Guardrail, G4(Modified) With Freeway Curb And Gutter | May, 2012 |
C-10.05, Sht. 2 | W-Beam Guardrail, G4(Modified) With Freeway Curb And Gutter | May, 2012 |
C-10.06, Sht. 1 | W-Beam Guardrail, Nested, Types 1 And 2 | May, 2012 |
C-10.06, Sht. 2 | W-Beam Guardrail, Nested, Type 3 | May, 2012 |
C-10.07, Sht. 1 | W-Beam Guardrail, Bolted Anchor | May, 2012 |
C-10.07, Sht. 2 | W-Beam Guardrail, Bolted Anchor | May, 2012 |
C-10.08 | W-Beam Guardrail, End Anchor | May, 2012 |
C-10.20 | Thrie-Beam Guardrail, G9, Blocked-Out Steel Post | May, 2012 |
C-10.20, Sht. 1 | Guardrail End Terminal Pad Layout for Soft Stop | Dec., 2017 |
C-10.20, Sht. 2 | Guardrail End Terminal Pad Layout for Soft Stop | Dec., 2017 |
C-10.21, Sht. 1 | Guardrail End Terminal Pad Layout for MSKT | Dec., 2017 |
C-10.21, Sht. 2 | Guardrail End Terminal Pad Layout for MSKT | Dec., 2017 |
C-10.22, Sht. 1 | Guardrail End Terminal Pad Layout for Max-tension | Feb., 2018 |
C-10.22, Sht. 2 | Guardrail End Terminal Pad Layout for Max-tension | Feb., 2018 |
C-10.30, Sht. 1 | Guardrail Transitions, Thrie Beam To Concrete Half Barrier, 32" Type 'F' | May, 2012 |
C-10.30, Sht. 2 | Guardrail Transitions, Thrie Beam To Concrete Half Barrier, 32" Type 'F' | May, 2012 |
C-10.40 | Concrete Median Barrier, 32" Type 'F', Cast-In-Place | May, 2012 |
C-10.41 | Concrete Median Barrier, 42" Type 'F', Cast-In-Place | May, 2012 |
C-10.42, Sht. 1 | Glare Screen, Concrete Median Barrier | May, 2012 |
C-10.42, Sht. 2 | Glare Screen, Concrete Median Barrier | May, 2012 |
C-10.42, Sht. 3 | Glare Screen, Concrete Median Barrier | May, 2012 |
C-10.50, Sht. 1 | Concrete Half Barrier, 32" Type 'F', Cast-In-Place | May, 2012 |
C-10.50, Sht. 2 | Concrete Half Barrier, 32" Type 'F', Precast | May, 2012 |
C-10.51 | Concrete Half Barrier, 32" Type 'F' With Sidewalk | May, 2012 |
C-10.52 | Concrete Half Barrier, 32" Type 'F' With Gutter | May, 2012 |
C-10.53 | Concrete Half Barrier, 42" Type 'F' With Gutter | May, 2012 |
C-10.54, Sht. 1 | Concrete Half Barrier, 32" Type 'F' At Piers, Cast-In-Place | May, 2012 |
C-10.54, Sht. 2 | Concrete Half Barrier, 32" Type 'F' At Piers, Precast | May, 2012 |
C-10.54, Sht. 3 | Concrete Half Barrier, 32" Type 'F' At Piers, Layout | May, 2012 |
C-10.55, Sht. 1 | Concrete Half Barrier, 42" Type 'F' At Piers, Cast-In-Place | May, 2012 |
C-10.55, Sht. 2 | Concrete Half Barrier, 42" Type 'F' At Piers, Precast | May, 2012 |
C-10.55, Sht. 3 | Concrete Half Barrier, 42" Type 'F' At Piers, Layout | May, 2012 |
C-10.70, Sht. 1 | Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons | May, 2012 |
C-10.70, Sht. 2 | Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons | May, 2012 |
C-10.70, Sht. 3 | Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons | May, 2012 |
C-10.71, Sht. 1 | Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Curb & Gutter | May, 2012 |
C-10.71, Sht. 2 | Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Curb & Gutter | May, 2012 |
C-10.72, Sht. 1 | Concrete Half-Barrier Transition, 42" To 32" Type 'F' With Caissons | May, 2012 |
C-10.72, Sht. 2 | Concrete Half-Barrier Transition To Vertical, 42" To 32" Type 'F' With Caissons | May, 2012 |
C-10.72, Sht. 3 | Concrete Half-Barrier Transition To Vertical, 42" To 32" Type 'F' With Caissons | May, 2012 |
C-10.73, Sht. 1 | Concrete Half-Barrier Transition To Vertical, 42" Type 'F' With Gutter | May, 2012 |
C-10.73, Sht. 2 | Concrete Half-Barrier Transition To Vertical, 42" Type 'F' With Gutter | May, 2012 |
C-10.74 | Concrete Half-Barrier Transition, 42" To 32" Type 'F' | May, 2012 |
C-10.75, Sht. 1 | Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 1 | May, 2012 |
C-10.75, Sht. 2 | Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 2 | May, 2012 |
C-10.76 | Concrete Half-Barrier Transition, Type 'F' At Radius, 32" To 0" | May, 2012 |
C-10.77 | Concrete Half-Barrier Transition, End Terminal, Curb And Gutter | May, 2012 |
C-10.77 | Concrete Barrier Transition to Guardrail End Terminal Layout with Curb | Dec., 2017 |
C-13.15 | Typical Pipe Installation | Jan., 2020 |
C-13.15 | Typical Pipe Installation | May, 2012 |
Historical Construction Standard Drawings
Construction Standard Drawings that have been updated or deleted before May 2012 are listed below. Newer superseded drawings are listed under Superseded Construction Standard Drawings.
|
|
Historical Construction Standard Drawing Memos
2007
- Construction Standard Drawings Update Memo - 2007 (Historical; revised September 2007)
- Construction Standard Drawings: Memo June 2007 (Historical; revised June 12, 2007)
2006
- Roadway Construction Standard Drawings Update Memo December 2006 (Historical; revised Dec. 20, 2006)
- Construction Standard Drawings: Slop Design Standard Revisions: C-02.20 and C-02.30 (Historical; revised April 25, 2006)
- Construction Standard Drawings Update Memo - 2006 (Historical; revised April 18, 2006)
2005
- Construction Standards Update Memo - 2005 (Historical; revised July 29, 2005)
2004
- Constructions Standards Update Memo - 2004 (Historical; revised Oct. 20, 2004)