I-17 Van Buren to Anthem Way: Intelligent Transportation System (ITS) Infrastructure Installation
I-17 Van Buren to Anthem Way: Intelligent Transportation System (ITS) Infrastructure Installation
This project is complete
Overview
The Arizona Department of Transportation completed this project in June 2023. The project installed a high-speed fiber optic backbone along Interstate 17 from Van Buren Avenue to Anthem Way, connecting existing Intelligent Transportation System (ITS) devices with new ITS improvements. This system connects Dynamic Message Signs (DMS) that provide drivers with real-time, traffic-related information, ramp metering and CCTV cameras along the corridor.
Project Elements
- Installed approximately 31 miles of ducts and fiber optic cables within existing ITS conduit infrastructure.
- Repaired or replaced existing ITS conduit and pull box infrastructure where necessary.
- Installed fiber optic panels within existing communications buildings.
- Installed advanced warning signs within the roadway right-of-way as needed.
- Installed telecommunications pull box cabinets.
- Removed minimal vegetation to allow for conduit and pull box repair/replacement.
Project Area Map
What to Expect
Construction began January 2022 and was completed in June 2023.
Stay Up to Date
Submit questions and comments or request information in any of the following ways:
- Email: [email protected]
- Phone: ADOT Project Information Line: 855.712.8530
- Teléfono: Línea de Información del Proyecto ADOT: 855.712.8530
- By Mail: ADOT Communications, 1655 W. Jackson St., MD 126F, Phoenix, AZ 85007