The Arizona Department of Transportation recently completed a road rehabilitation project along State Route 79 in Pinal County between Florence and Tucson. This project extended the life of the pavement between mileposts 105 and 110.

Project Elements

This project included the following elements:

  • Repaired the asphalt, as needed
  • Removed and replaced the existing top layer of pavement
  • Pavement treatments
  • Installed new pavement markings

Project Schedule

Construction on this project began in April 2026 and was completed in June 2026.

Project Area Map

Project Area Map

Project Photos

State Route 79 Rehabilitation Project: Mileposts 105 to 110 Project Photo
State Route 79 Rehabilitation Project: Mileposts 105 to 110 Project Photo

 

Stay Informed

...
  • Phone: Call the ADOT Bilingual Project Information Line at 855.712.8530.
  • Email: Submit a question or comment via email to Kara Spinney at [email protected].
  • For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter @ArizonaDOT or call 511, except while driving.