… Is Complete Project Cost: $9,900,000 The Arizona Department of Transportation completed … 425-435). The purpose of the project was to extend the life of the roadway by removing … as making spot repairs, pothole repairs and new pavement markings. Project Flyer View …
… Overview The Arizona Department of Transportation has started a construction project to improve US 60X (also referred to as Old US … Trail were improved by lengthening or adding new turn bays while others were removed (see …
… This project is complete Overview The Arizona Department of Transportation completed a project to replace light fixtures on east- and … 400 high-pressure sodium luminaires (HPS) with new light emitting diode (LED) fixtures Other …
… Overview The Arizona Department of Transportation will begin … on State Route 289 from milepost 0 (Ruby Road) to milepost 11 (Peña Blanca Lake parking lot) … bridge deck seals at I-19 overpass Install new fencing And other miscellaneous …
… Overview Project cost : $17 million The Arizona Department of Transportation has … (mileposts 423-432). The project is expected to be under construction in spring 2025 and … flood control channels and reconstruct new concrete channels, as needed. Repair …
… will reconstruct the existing intersection to separate SR 347 from Riggs Road traffic on a new bridge. The purpose of the project is to … The project is a partnership between the Arizona Department of Transportation (ADOT), …
… Overview The Arizona Department of Transportation in collaboration with the town of Marana are working to reconstruct Dove … Restriping the intersection Constructing new sidewalk ramps Other miscellaneous …
… Overview The Arizona Department of Transportation in … Casa Grande will begin a project in fall 2025 to install a traffic signal at Centennial … four corners of the intersection Constructing new sidewalk ramps Constructing a right-turn …
… Project Cost: $30 million Overview The Arizona Department of Transportation, in … 319-331) Work on these projects is scheduled to resume in April 2025 be completed by the … bridge approach and departure to match the new deck elevation Pavement Life Extension …
… Project Cost: $10.1 million The Arizona Department of Transportation is working on a project to replace the deck on the I-40 Andy Devine … guardrail and catch basins. Installing new signage, striping and other related work. …