Skip to main content
SECRET BUTTON
facebook/azdot
twitter/arizonadot
linkedin/adot
instagram/arizona_dot
flikr/azdot
youtube/azdot
ADOT Blog
Search form
Search
ADOT
Arizona Department of Transportation
About
Inside ADOT
Transportation Safety
Government Relations
Audit and Analysis
Financial Management Services
Boards and Committees
Careers with ADOT
Scenic Roads
Historic Roads
Grand Canyon Airport
The Inside Lane
Fast Facts from ADOT
ADOT Kids
Motor Vehicles
Hours and Locations
Online Services
Driver Services
Vehicle Services
Motor Carrier Services
Professional Services
Enforcement
Executive Hearing
Forms and Publications
Statistics
New to AZ
FAQ
Contact MVD
Projects
Central District
Northwest District
Northcentral District
Northeast District
Southwest District
Southcentral District
Southeast District
Weekend Freeway Travel Advisory
Business
ADOT Business Coach
Business Engagement and Compliance
Civil Rights
Contracts and Specifications
District Contacts
Engineering and Construction
Engineering Consultants
Environmental Planning
Equipment Services
Highway Maintenance
Procurement
Programs and Partnerships
Project Management Services
Right of Way / Properties
Permits
Standards and Guidelines
Transportation Systems Management and Operations
Planning
Transportation Analysis
Transportation Programs
Transportation Studies
Transportation Programming
Transportation Planning
Transit Programs and Grants
Airport Development
Research Center
Contact Planning
News
Traffic
Traffic
Travel Times
ADOT Twitter
Freeway Cameras
Maps
Contact
Contact MVD
Contact ADOT
You are here
Home
»
Planning
»
Transportation Studies
»
Loop 303 from Interstate 10 to Proposed State Route 30
»
Documents - Loop 303 from I-10 to Proposed SR 30
Documents - Loop 303 from I-10 to Proposed SR 30
Overview
Timeline
Maps
Documents
Videos
Final Approved Design Concept Report 2018
Final EA FONSI
Appendices
Appendix A - Alternatives Evaluation Matrix
Appendix B - Programmatic Agreement
Appendix C - Air Quality Report
Appendix D - Noise Analysis Technical Report
Appendix E - Biological Review and Update
Appendix F - NRCS CPA 106 Form
Appendix G - Public Involvement Summary
Air Quality Technical Study
(September 2018)
Planning
Transportation Programming
Transportation Planning
Transportation Analysis
Transportation Programs
Transit Programs and Grants
Grant Coordination
Airport Development
Research Center
Transportation Studies
Overview
Binational Freight Corridor Study
Binational San Luis Transportation Study
Central District Freeway Frontage Road Traffic Control Study
Grand-35 Study
Grand Canyon National Park Airport Master Plan Study
GCNPA Drainage Master Plan and Water Use Study
I-10 and SR 210 Study
I-11 and Intermountain West Corridor Study
I-15 Virgin River Bridge No. 1 Study
I-17: Central Avenue Bridge Replacement Study
I-17: Indian School Road Traffic Interchange Study
I-17 Near-Term Auxiliary Lane Study
Loop 101 Price Freeway Study
Loop 303:SR 30 to Hassayampa Freeway Study
Loop 303: I-10 to Proposed State Route 30
Overview
Timeline
Maps
Documents
Videos
Milton Road Corridor Master Plan
Nogales Bicycle and Pedestrian Master Plan/Royal Road Multi-Use Path
North-South Corridor Study
Smart Work Zone (SWZ) Technical Concept Study
Sonoran Corridor Tier 1 Environmental Impact Statement
SR 30: Loop 303 to Loop 202 Study
SR 51 Ramp Meter Study
SR 87 Corridor Development Study
US 60 Corridor Study (SR 74 to Wickenburg)
US 93 at Pierce Ferry Road Feasibility Study
US 180 Corridor Master Plan
Wildlife Vehicle Conflict Study
Completed Transportation Studies
Contact Planning