Project Cost: $3.9 million
The Arizona Department of Transportation, in partnership with the Navajo Nation, has started work on a bridge replacement project on the Coyote Wash Bridge over State Route 87. The bridge is located about 30 miles north of Winslow (milepost 375). Construction is expected to be completed by the end of the year.
The project limits will extend approximately a quarter-mile north of the bridge and about a half-mile south of the bridge along SR 87.
Project Flyer
Project Area Map
Project Elements
The purpose of this project is to replace the existing bridge. The work will include:
- Removing and replacing the existing bridge superstructure.
- Installing erosion prevention elements under the bridge
- Replacing guardrails, paving bridge approaches, adding new pavement markings and other miscellaneous work.
What to Expect During Construction
The existing bridge will be reduced to only lane only with alternating north- and southbound travel during construction. This will enable drivers to continue to access the area while half of the bridge is demolished at a time. The new bridge will be constructed one-half at a time with drivers sharing the other lane. Traffic will be directed through the work zone by a temporary traffic signal.
Drivers should plan for extra travel time and watch for construction workers and equipment while traveling through the area.
ADOT will post information about traffic restrictions and closures as it becomes available. To receive traffic alerts and other updates by email, please subscribe here.
You can also stay informed of real-time, project-related traffic restrictions by visiting az511.gov or call 511, except while driving.
Schedules are subject to change because of weather or other unforeseen factors. Remember to slow down and be prepared to come to a complete stop as you approach and drive through the work zone.
Stay Informed
By email: Subscribe to receive traffic alerts and project updates directly to your email.
By phone: 602.550.8397
Línea Bilingüe de Información del Proyecto ADOT: 855.712.8530
Online: Submit a question or comment to [email protected].
By mail: Ryan Harding, ADOT Community Relations, 1655 W. Jackson St., MD 126F, Phoenix, AZ 85007.