This project is currently shut down for the winter
Project Cost:$2.1 million
The Arizona Department of Transportation has initiated a pavement project along Business 40 (B-40), locally known as Navajo Boulevard, in Holbrook. The mile-long project is located between Crestview Drive and Joy Nevin Avenue (milepost 287). Construction is currently halted until spring 2025 for the winter.
The Arizona Department of Transportation, in partnership with the Navajo Nation, is working on two projects east of Holbrook along Interstate 40. They include Dead River Bridge Rehabilitation (milepost 316), and a pavement life-extension project roughly between Pinta and McCarrell roads near the community of Chambers (mileposts 319-331)
The Arizona Department of Transportation has completed a pavement project along State Route 260 east of Heber-Overgaard. The 6-mile-long project is roughly between Bison Ranch Road and Camperland Road (mileposts 310-316).
The Arizona Department of Transportation, in partnership with the White Mountain Apache Tribe, has initiated a safety improvement project at the intersection of State Route 73 and State Route 260 in Indian Pine. Construction is expected to begin in spring 2025.
The Arizona Department of Transportation, in partnership with the Navajo Nation, has completed work on a bridge replacement project on the Coyote Wash Bridge over State Route 87. The bridge is located about 30 miles north of Winslow (milepost 375).
The Arizona Department of Transportation is currently working on a project along State Route 77, locally known as Main Street in the town of Snowflake, to install a new sidewalk on the west side of the highway roughly between 20th Street South and Rodeo Road (milepost 359).
The Arizona Department of Transportation has completed a pavement project along US 191 in the town of St. Johns. The mile-long project was between the Little Colorado overpass near Water Street and Cemetery Road (milepost 316).