Overview
Project Cost: $7 million
The Arizona Department of Transportation is working on a bridge replacement project on the Teesto Wash Bridge over State Route 87. The bridge is located about 30 miles north of Winslow (MP 385). The new bridge is open to traffic. Work on the new bridge will be completed spring 2024.
The project limits extend approximately a quarter-mile north of the bridge and about a half-mile south of the bridge along SR 87.
Project Elements
The purpose of this project is to replace the existing bridge. The work includes:
- Replacing the existing bridge with a new two-span bridge.
- Realigning the roadway as it approaches the bridge.
- Replacing guardrails and adding new pavement markings and other miscellaneous work.
Project Flyer:
Project Area Map
What to Expect During Construction
The existing bridge will be reduced to only lane only with alternating north- and southbound travel during construction. This will enable drivers to continue to access the area while half of the bridge is demolished. Traffic will be directed through the work zone by a temporary traffic signal. Drivers should plan for extra travel time and watch for construction workers and equipment while traveling through the area.
The new bridge has been constructed next to the existing bridge. Traffic has been shifted onto the new bridge.
ADOT will post information about traffic restrictions and closures as it becomes available. To receive traffic alerts and other updates by email, please subscribe here.
You can also stay informed of real-time, project-related traffic restrictions by visiting az511.gov or call 511, except while driving.
Schedules are subject to change because of weather or other unforeseen factors. Remember to slow down and use caution around construction workers and equipment.
Traffic Alerts
New Teesto Wash Bridge along SR 87 between Winslow and Second Mesa open to traffic
The Arizona Department of Transportation advises drivers that roadway restrictions at the new Teesto Wash Bridge on State Route 87 between the communities of Winslow and Second Mesa at milepost 385 have been lifted and the bridge is open to two-way traffic.
Crews will return next spring to complete paving and permanent striping on the new bridge.
ADOT thanks drivers and nearby communities for their support and patience throughout the project.
Stay Informed
- By email: Subscribe to receive traffic alerts and project updates directly to your email.
- By phone: 855.712.8530
- Teléfono: 855.712.8530
- Online: Submit a question or comment through the ADOT website by visiting azdot.gov/Contact and then select “Projects” from the dropdown menu.
- By mail: Write to ADOT Community Relations, 1655 W. Jackson St., MD 126F, Phoenix, AZ 85007.
- ADOT Project Number: 087 NA 384 F0232 01C; Federal-Aid Number: NHPP-087-D(204)T