Expect delays traveling on US 60 between Show Low and Springerville as a pavement project resumes May 28

Learn more

The Arizona Department of Transportation advises drivers to prepare for delays along US 60 between Show Low and Springerville in the White Mountains area as a pavement project resumes work between State Route 61 and Wildcat Creek Thursday, May 28, after a winter hiatus.

Drivers should expect the following restrictions from 5 a.m. to 7 p.m. Mondays through Fridays:

  • US 60 will be reduced to one lane only in 3-mile segments with alternating east- and westbound travel between SR 61 and Wildcat Creek (mileposts 353-369). 
  • Drivers will be directed through the work zone by flaggers and a pilot car. 
  • A 12-foot vehicle-width restriction will be in place.
  • Drivers need to be prepared to make frequent stops when approaching and driving through the work zone and use caution around construction personnel and equipment while the restrictions are in place. 
  • Restrictions will be lifted each day after work hours; however, reduced speed limits will remain in effect.
  • No work is planned for weekends or state holidays.

The restrictions are needed so crews can apply a chip seal pavement treatment to the roadway, which should be completed by mid-June. 

Crews will return approximately 30 days later to permanently stripe the new section of road, completing the project.

Show less

US 60: SR 61 - Wildcat Creek Pavement Rehabilitation

US 60: SR 61 - Wildcat Creek Pavement Rehabilitation

Contents

Overview

Project Cost: $9.5 million

The Arizona Department of Transportation is working on a pavement rehabilitation project along US 60 between Show Low and Springerville. The 16-mile-long project is between State Route 61 and Wildcat Creek (mileposts 353-369). 

The project is scheduled to be completed by late summer 2026.

Project Map

US 60, SR 61 Project Map

Project Elements

The purpose of this project is to rehabilitate the pavement and create a smooth driving surface for motorists. The work will include: 

  • Removing and replacing the top layer of pavement along the highway. 

  • Building up the shoulders.

  • Replacing the existing guardrail.

  • Improving drainage.

  • Other related work. 

What to Expect During Construction

US 60 will be reduced to one lane only in segments no longer than 3 miles with alternating east- and westbound travel during construction. Vehicles will be directed through the work zone by flaggers and a pilot car. Work will take place Mondays through Fridays from 6 a.m. to 6 p.m. No work is planned on weekends or holidays. Restrictions will be lifted each day after work hours.

Drivers should plan for extra travel time and watch for construction workers and equipment while traveling through the area.

ADOT will post information about traffic restrictions and closures as it becomes available. To receive traffic alerts and other updates by email, please subscribe here.

You can also stay informed of real-time, project-related traffic restrictions by visiting az511.gov or call 511, except while driving.

Schedules are subject to change because of weather or other unforeseen factors. Remember to slow down and use caution around construction workers and equipment.

Stay Informed

...

Subscribe to receive project updates and traffic alerts.

  • By Email/Phone: Contact Ryan Harding at [email protected] or 602.550.8397
  • Línea Bilingüe de Información del Proyecto ADOT: 855.712.8530
  • Mail: Ryan Harding, ADOT Community Relations, 1655 W. Jackson St., MD 126F, Phoenix, AZ 85007.