I-40 Anvil Rock Road Bridge Deck Replacement

Overview

The Arizona Department of Transportation is initiating a bridge deck replacement project at the I-40 Anvil Rock Road Bridge west of Seligman in Yavapai County.

This project is located approximately 11 miles west of Seligman (milepost 109), and will include the removal and replacement of the existing bridge deck, which is the top surface of the bridge that motorists drive on, as well as the approach slabs, guardrail and pavement markings.

Project Map

Project map

What to expect during construction

  • Work will occur from 6 a.m. to 6 p.m. weekdays, Sunday through Thursday. 
  • Temporary traffic control barriers will be installed in the work zone.
  • I-40 will be reduced intermittently to one lane. 
  • During bridge deck demolition, deck pouring and bridge barrier pouring operations, there will be times when full closures of I-40 will be necessary. This work will occur overnight, and traffic will be detoured around the work zone.
  • The speed will be reduced in the work zone.
  • ADOT reminds drivers to proceed through the work zone with caution, slow down and watch for construction personnel and equipment.

Project Schedule 

Construction is scheduled to begin early this spring and finish in the fall. More information will be posted on this project web page prior to the work starting.

Schedule subject to change based on weather or other unforeseen factors.

Restrictions and Closures

For information about project-related traffic restrictions, please visit az511.gov or call 511, except while driving.

ADOT will provide more information about project schedules and upcoming restrictions as information becomes available. Stay informed of traffic restrictions before they occur by subscribing.

Stay Informed

ADOT welcomes your questions and comments. Please contact us in any of these ways:

  • Online: Submit a question or comment through the ADOT website. Visit azdot.gov/Contact and then select Projects from the dropdown menu.
  • By phone: Call the ADOT Bilingual Project Information Line at 855.712.8530.
  • Teléfono: Línea de Información del Proyecto ADOT: 855.712.8530
  • By mail: Write to ADOT Community Relations, 3660 E. Andy Devine Ave. Kingman, AZ 86401