US 191: Table Top Road Pavement Rehabilitation
US 191: Table Top Road Pavement Rehabilitation
Contents
Overview
The Arizona Department of Transportation is completing a pavement rehabilitation project located in Greenlee County on US 191 between milepost 160 and 173 near the Town of Clifton. This project started July 2024 and is expected to continue until summer 2025.
Project Fact Sheet
Project Area Map
Project Elements
- Applying a two-pass micro-surface on existing asphalt.
- Replacing pavement markings.
- Implementing pavement spot repairs.
Project Schedule
- Construction started July 2024 with guardrail replacement
- Crews began paving fall 2024
- Project expected to be completed summer 2025
What to Expect
- Lane closures are anticipated. In areas along US 191 that are two lanes, a flagging operation will be utilized to direct traffic.
- Drivers should prepare for up to 2-mile delays when passing through the work area.
ADOT will provide advance notice of restrictions and closures to email subscribers and on the project traffic alert web page
Stay Informed!
Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or [email protected]. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter @ArizonaDOT or call 511, except while driving.