The Arizona Department of Transportation is starting a project to install Queue Warning and Dynamic Message Board systems and flashing beacons on Interstate 10 and I 8 within La Paz and Maricopa counties.
Project Elements
- Install a Queue Warning System including flashing beacons, thermal detector poles, cabinets, foundations, roadside signs and conduit
- Install Dynamic Message Boards including poles, foundations, pull boxes, conduit and associated equipment
- Install pole-mounted CCTV cameras and associated equipment
- Install aluminum sign panels, flashing beacons, and associated equipment
- Replace and install new guardrail
- Sawcut and match existing pavement
Project Schedule
- The project is scheduled to begin late summer 2026 and is expected to take 6 months to complete.
Stay Informed

Schedules are subject to change based on weather and other unforeseen factors. Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or at [email protected]. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.