US 95, Imperial Dam Road to Aberdeen Road widening

US 95, Imperial Dam Road to Aberdeen Road widening

Contents

Overview

The Arizona Department of Transportation is working to improve safety and traffic flow on US 95 between milepost 43 (near Imperial Dam Road) and milepost 48 (near Aberdeen Road).

Project Elements

  • Reconstruct and widen the existing two-lane roadway into a four-lane divided roadway.
  • Install new box and pipe culverts under the new roadway.
  • Construct two new roundabouts at Imperial Dam and Aberdeen Roads and widen the Martinez Lake Road intersection.
  • Construct two new bridges over the existing military tank crossing south of Martinez Lake Road. 
  • Install new pavement markings and signage.
  • Install new barbed wire wildlife fencing between Imperial Dam and Castle Dome Mine roads.

Project Schedule

Construction is scheduled to begin in summer 2025 and is expected to take approximately 14 months to complete.

Stay Informed

...

Schedules are subject to change based on weather and other unforeseen factors. Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or at [email protected]. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Pursuant to Title VI of the Civil Rights Act of 1964, the Americans with Disabilities Act (ADA) and other nondiscrimination laws and authorities, ADOT does not discriminate on the basis of race, color, national origin, sex, age, or disability. Persons that require a reasonable accommodation based on language or disability should contact Stephanie Dyer at [email protected] or 855.712.8530. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.