US 95, Wellton Mohawk Canal Road to Imperial Dam Road widening

US 95, Wellton Mohawk Canal Road to Imperial Dam Road widening

Contents

Overview

The Arizona Department of Transportation is designing a project to improve safety and traffic flow on US 95 between the Wellton-Mohawk Canal (milepost 38.5) and Imperial Dam Road (milepost 43.4). 

Project Area

The project is located on US 95 within Yuma County.

Project Elements

  • Reconstruct and widen the existing two-lane roadway to a five-lane roadway with a center turn lane from Wellton-Mohawk Canal to Dome Valley Road, and a four-lane divided roadway from Dome Valley Road to Imperial Dam Road.

  • Reconstruct and widen the existing bridge over the Gila River. 

  • Install new box culverts and pipe culverts under the new roadway.

  • Reconstruct the intersections at Adair Park and Dome Valley roads.

  • Construct two new bridges over the existing military tank crossing, south of Imperial Dam Road. 

  • Install new pavement markings and signage.

  • Install new barbed wire wildlife fencing between Adair Park and Imperial Dam roads.

Project Schedule

  • The project is currently in the design phase with an expected completion date of December 2025. Construction is not funded. 

Stay Informed

...

Schedules are subject to change based on weather and other unforeseen factors. Subscribe to receive project updates and traffic alerts by email. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or submit a question or comment by email at [email protected]. For real-time highway conditions statewide, visit ADOT’s Traveler Information site at az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.