Archived - Materials PPD Manual

Archived - Materials PPD Manual

Unless otherwise specified, changes issued below are effective for projects with a bid opening date on or after the Effective Date. Retain items replaced by these changes for use as necessary on projects with a bid opening date prior to the Effective Date.

 

Effective Date Designation Subsection/Summary of Changes
May 21, 2021 PPD1/Sampling, Testing, and Acceptance of Reinforcing Bars ARCHIVED - Incoporated into ADOT Specification 1003 Reinforcing Steel 
May 21, 2021 PPD9/Guidelines for Inpection and Acceptance of Timber Guardrail Posts and Blocks ARCHIVED - Incoporated into ADOT Specification 1012 Guardrail Materials
Sept 13, 2020 PPD2/Certification and Acceptance of Chemical and Air-Entraining Admixtures for Portland Cement Concrete ARCHIVED – Incorporated into ADOT Specification 1006 Portland Cement Concrete
Sept 13, 2020 PPD3a/Curing Compounds ARCHIVED - Incorporated into ADOT Specification 1006 Portland Cement Concrete
Sept 13, 2020 PPD5a/Evaluation of Concrete Aggregate Sources ARCHIVED - Incorporated into ADOT Specification 1006 Portland Cement Concrete
Sept 13, 2020 PPD7/Inspection of Concrete Batch Plants and Concrete Mixer Trucks ARCHIVED - Incorporated into ADOT Specification 1006 Portland Cement Concrete
Sept 13, 2020 PPD15a/Submittal and Approval of Portland Cement Concrete Mix Designs ARCHIVED - Incorporated into ADOT Specification 1006 Portland Cement Concrete
Sept. 19, 2016 PPD 16/Radiation Safety Program

REMOVED - Moved to Materials Quality Assurance as a standalone document

Mar. 20, 2020 PPD 19a/ADOT System for the Evaluation of Testing Laboratories REMOVED - Moved to Materials Quality Assurance as a standalone document
Mar. 20, 2020 PPD 21/Sampling, Testing, and Acceptance of Glass Beads (Spheres) for Stripping Materials  ARCHIVED - Incorporated into ADOT Specification 708 Permanent Pavement Markings
Sept 13, 2020 PPD22/Qualification and Specification Requirements for the Manufacturing of Precast/Prestress Concrete Bridge Members ARCHIVED - Incorporated into ADOT Specification 1006 Portland Cement Concrete, 601 Concrete Structures, and 602 Prestressing Concrete
Mar. 20, 2020 PPD 24/Requirements for the Approval of Mechanically Stabilized Earth (MSE) Wall Systems  REMOVED – Moved to Geotechnical Services as a standalone document

 

Archived

Archived Change Letters

Change
Letter #
Effective Date Subject
19 September 13, 2020 Change Letter #19
18 November 5, 2014 Change Letter and Attachments
Title Page; Table of Contents; Policy and Procedure Directives No. 14a and No. 19a.
17 August 30, 2013 Change Letter and Attachments
Title Page; Table of Contents; Policy and Procedure Directive No. 24.
16 August 30, 2013 Change Letter and Attachments
Title Page; Table of Contents; Policy and Procedure Directives No. 15a and No. 20a.
15 August 30, 2013 Change Letter and Attachments
Title Page: Table of Contents; Policy and Procedure Directive No. 16c.
14 September 28, 2012 Change Letter and Attachments
Title Page, Table of Contents, Policy and Procedure Directive No. 23.
13 July 6, 2011 Change Letter and Attachments
Title Page; Table of Contents; Policy and Procedure Directives No. 16b, No. 21, and No. 22.
12 April 14, 2010 Change Letter and Attachments
Title Page; Table of Contents; Policy and Procedure Directives No. 3a, No. 5a, No. 13a, No. 16a, No. 19, and No. 20.
11 February 27, 2009 Change Letter and Attachments
Entire Policy and Procedure Directives Manual [Title Page; Table of Contents; Introduction; P.P.D. #1 (92-2), #2 (96-1), #3 (96-4), #4 (96-6), #5 (96-8), #6 (96-9), #7 (96-10), #8 (96-11), #9 (02-01), #10 (04-1), #11 (04-2), #12 (04-3), #13 (04-4), #14 (04-5), #15 (07-1), #16, #17, and #18].
10 February 7, 2007 Change Letter
Distribution Memo; Table of Contents; P.P.D. No's. 03-1 and 07-1.
9 January 30, 2004 Change Letter
Title Page; Distribution Memo; Table of Contents; P.P.D. No's. 85-5, 92-6, 96-2, 96-3, 96-5, 96-7, 02-01, 03-1, 04-1, 04-2, 04-3, 04-4, and 04-5.
8 March 1, 1996 Change Letter
Title Page; Distribution Memo; Changes in the Policy and Procedure Directives Manual; Table of Contents; P.P.D. No's. 85-7, 87-2, 90-1, 90-2, 90-3, and 85-8.
7 July 1, 1992 Change Letter
Cover Letter and Attachments
Table of Contents; P.P.D No's. 85-6, 85-9, 86-2, 87-1, 90-2, 92-1, 92-2, 92-3, 92-4, 92-5, and 92-6.
6 February 1990 Change Letter
Title Page; Distribution Memo; Changes in the Policy and Procedure Directives Manual; Table of Contents; P.P.D. No's. 85-7, 87-2, 90-1, 90-2, 90-3, and 85-8.
5 December 1987 Change Letter
Table of Contents; P.P.D. No's. 85-1, 87-1, and 87-2.
4 October 1986 Change Letter
Distribution Memo; Changes in the Policy and Procedure Directives Manual; Table of Contents; P.P.D. No's. 80-2, 85-2, 86-1, and 86-2.
3 July 1985 Change Letter
Title Page; P.P.D. No's. 80-1, 81-2, 81-3, 81-4, 81-5, 82-1, 82-2, 82-4, 82-5, 82-6, 85-1, 85-2, 85-3, 85-4, 85-5, 85-6, 85-7, 85-8, and 85-9.
2 May 1982 Change Letter
P.P.D. No's. 82-5 & 82-6.
1 January 1982 Change Letter
P.P.D. No's. 80-1, 80-2, 80-3, 80-4, 81-1, 81-2, 81-3, 81-4, 81-5, 82-1, 82-2, 82-3, and 82-4.