Expect delays and plan for at least an hour detour
The Arizona Department of Transportation advises drivers to plan for the full closure of US 60 between Superior and Miami, mileposts 227-243, from 9 a.m. to 2 p.m. Wednesday, May 22, for blasting operations related to the US 60, Queen Creek and Waterfall Canyon Bridges Replacement Project.
- US 60 between Miami and Magma Mine Road, near milepost 231, will remain open for local traffic only.
Full closures of US 60, when required, will occur from 9 a.m. to 2 p.m. Tuesdays, Wednesdays or Thursdays through November.
DETOUR: Eastbound US 60 drivers will use southbound State Route 177 through Winkleman to northbound SR 77. Westbound US 60 drivers will use southbound SR 77 through Winkleman to northbound SR 177. Due to the roughly 75-mile length of this detour, drivers may want to consider planning travel before 9 a.m. and after 2 p.m.
Motorist should plan for:
- Lane restrictions and speed reductions in the work zone.
- A 12-foot vehicle width restriction to be in place. Oversize loads may be accommodated with advance notice.
Drivers should allow extra travel time and be prepared to slow down, use caution and merge safely when approaching and traveling through highway work zones.