Skip to main content
Highway projects big and small have been part of what ADOT does since our inception in 1974. Notifying people about those projects is also a big part of the agency's work.
I-10 Broadway Curve Improvement Project
The Arizona Department of Transportation is advising motorists to plan ahead and expect to use detours as eastbound I-10 will be closed between SR 51 and US 60 from 10 p.m. Fri., Nov. 8, to 4 a.m. Mon

Heads up to all you semi, bus and other commercial vehicle drivers out there. New federal regulations will take effect soon.

Andy Devine Ave & 2nd St Improvements map

This project is complete

Project Cost: $1,061,908

The Arizona Department of Transportation, in partnership with the Western Arizona Council of Governments and the city of Kingman, started construction in November to make street improvements on Andy Devine Avenue between 2nd Street and Ella’s Place (previously known as West Andy Devine Ave).

Map of proposed road to future Douglas Port of Entry in Douglas
The Arizona Department of Transportation is holding a public hearing Nov. 19 to discuss the recommended location of a connector road between State Route 80 and a proposed new commercial land port of
The much-anticipated project to add lanes and other improvements along Loop 202 (Santan Freeway) east of Loop 101 in Chandler and Gilbert started in early August. Here's a check-in with ADOT's resident engineer.
A lot goes into making sure rest areas are clean, stocked and ready to serve travelers 24 hours a day throughout the year, including having resident caretakers at larger rest areas. That's why this week's episode of On the Road With ADOT features Bobby Wheeler, ADOT's rest area manager. 
The State Route 79 bridge over the Gila River in Florence has withstood the test of time.
911

Closures set along sections of L-101 Price, L-202 Santan, L-303

PHOENIX – Three freeway closures are scheduled for improvement projects in the Phoenix area this weekend (July 24-27), according to the Arizona Department of Transportation. Restriction schedules are subject to change due to inclement weather or other factors. Drivers should allow extra travel time and use detour routes as needed for these weekend freeway restrictions:

  • Southbound Loop 101 (Price Freeway) closed between Loop 202 (Red Mountain Freeway) and Rio Salado Parkway in the Tempe area from 9 p.m. Friday to 5 a.m. Monday (July 27) for a pavement improvement project. Southbound Loop 101 on-ramps at Thomas, McDowell and McKellips roads closed starting at 8 p.m. Detour: Consider exiting ahead of the closure and using local routes, including southbound Scottsdale or Alma School roads, to travel beyond the closure. Note: The southbound Loop 101 ramps to Loop 202 (both directions) will be open. Expect heavy traffic and delays.
  • Northbound State Route 51 narrowed to two lanes between Northern Avenue and Shea Boulevard from 9 p.m. Friday to 5 a.m. Monday (July 27) for a pavement improvement project. Allow extra travel time and be prepared to merge safely when approaching and traveling through all work zones. Consider using northbound I-17 as an alternate freeway route to north Phoenix. Allow extra travel time.

Note: Northbound SR 51 will be narrowed to two lanes around-the-clock from Highland Avenue to Camelback Road for approximately seven weeks starting at 12:05 a.m. Monday (July 27) for necessary replacement of old, worn pavement. Consider using northbound I-17 as an alternate freeway route to North Phoenix.

  • Eastbound Loop 303 closed between 43rd Avenue and Interstate 17 in North Phoenix from 10 p.m. Friday to 5 a.m. Monday (July 27) for freeway widening project. Detour: Traffic can exit to northbound 43rd Avenue to reach eastbound Dove Valley Road for access to I-17 or other destinations, including North Valley Parkway.
  • Eastbound Loop 202 (Santan Freeway) closed between Gilbert Road and Williams Field Road from 10 p.m. Friday to 5 a.m. Monday (July 27) for freeway widening project. Detour: Consider using northbound Gilbert Road to eastbound Williams Field Road to reconnect with Loop 202.  
  • Westbound I-10 ramp to eastbound Loop 202 (Santan Freeway) closed from 9 p.m. Sunday to 5 a.m Monday for preliminary work on a future project. Detour: Consider using westbound I-10 to eastbound Chandler Boulevard to southbound Kyrene Road.

ADOT plans and constructs new freeways, additional lanes and other improvements in the Phoenix area as part of the Regional Transportation Plan for the Maricopa County region.

Most improvement projects are currently funded in part by Proposition 400, a dedicated sales tax approved by Maricopa County voters in 2004. Voters also approved Proposition 479 in November 2024, extending the existing half-cent tax to fund future transportation projects in the Phoenix region.

Reminder: Real-time highway conditions are available on ADOT’s Arizona Traveler Information site at AZ511.gov, the az511 app (download for Apple or Android devices) or by calling 511.

Weekend Closures Map

Close alert
BWC Work Zone
The Arizona Department of Transportation is advising motorists to plan ahead and expect to use detours as westbound and eastbound US 60 will have closures from Fri., Nov. 1, to Mon., Nov. 4, for