I-10 Broadway Curve Improvement Project
The Arizona Department of Transportation advises motorists to plan ahead and expect to use detours as northbound State Route 143 will be closed between Interstate 10 and Loop 202 (Red Mountain Freeway
BWC Work Zone
The Arizona Department of Transportation is pleased to announce that the newly constructed, additional travel lanes on  eastbound and westbound Interstate 10 mainline in the Broadway Curve area are

As Arizonans secure last-minute dinner plans and gifts for their loved ones this Valentine’s Day, we want to remind drivers that using your turn signals is an easy way to show your care for others on the road. 

If you’re out on the highways on Valentine’s Day, you might see our overhead message boards displaying a traffic safety message that encourages drivers to use their blinkers.

Drone shot of I-10/Orange Grove Road interchange
The Arizona Department of Transportation has finished reconstructing the interchange of Interstate 10 and Orange Grove Road, reopening the busy interchange to traffic early Wednesday morning.
I-40 8th Avenue Bridge Rehabilitation Project Map

Project Cost: $1.6 million

The Arizona Department of Transportation has initiated a bridge rehabilitation project along Interstate 40 over 8th Avenue in Holbrook. Work on this project is currently underway and is scheduled to be completed by the fall.

I-19 Canoa Rest Area Map
The Arizona Department of Transportation is tentatively scheduled to begin a project on the north- and southbound Interstate 19 Canoa Ranch rest areas to install weigh-in-motion systems with tire pressure sensors to replace the existing system controllers. The project is tentatively planned to start in the summer of 2025.
Centennial Boulevard and Pinal Avenue (SR 387) Intersection Improvements Project Map

City of Casa Grande Logo

Overview

The Arizona Department of Transportation in partnership with the city of Casa Grande will begin a project in fall 2025 to install a traffic signal at Centennial Boulevard and Pinal Avenue (SR 387). Additional improvements will feature: curb ramps for pedestrian accessibility

We invited Payson Maintenance Supervisor Brett Rupp into the On the Road With ADOT studio to discuss a recent incident in which ADOT personnel from Payson and Mesa teamed to put out a potentially nasty fire along SR 87 before it got out of hand.
911
Daytime closures scheduled on US 60 between Superior and Miami June 16-19

Detour in place during closures from 9 a.m. to 2 p.m.

The Arizona Department of Transportation advises drivers to plan for the following restrictions for blasting operations as part of a bridge replacement project: 

  • US 60 east of Superior, between mileposts 227-229, will be reduced to one lane with alternating east- and westbound travel from 5:30 a.m. to 5 p.m. Monday, June 16. Flaggers and a pilot car will assist drivers through the work zone.
  • US 60 between Superior and Miami (mileposts 227-243) will be closed from 9 a.m. to 2 p.m. Tuesday, June 17, Wednesday, June 18, and Thursday, June 19.
    • Flagging operations will be in effect before and after the full closures.
    • US 60 between Miami and Magma Mine Road (mileposts 231-243) will remain open for local traffic only.

Detour: Eastbound US 60 drivers use southbound State Route 177 through Winkelman to northbound SR 77. Westbound US 60 drivers use southbound SR 77 through Winkelman to northbound SR 177. Due to the roughly 75-mile length of this detour, drivers may want to consider planning travel before 9 a.m. and after 2 p.m. The detour is estimated to add an additional hour for trips between Superior and Miami.

Upcoming full closures and flagging operations: 

  • US 60 east of Superior will be reduced to one lane with alternating east- and westbound travel from 5:30 a.m. to 5 p.m. Monday, June 23. Flaggers and a pilot car will assist drivers through the work zone.
  • US 60 between Superior and Miami will be closed from 9 a.m. to 2 p.m. Tuesday, June 24, Wednesday, June 25, and Thursday, June 26. Flagging operations will be in effect before and after the full closures.

Schedules are subject to change based on weather and other unforeseen factors. Lane restrictions, speed reductions and a 12-foot vehicle width restriction will be in place for the duration of the project. Oversize loads may be accommodated with advance notice.

Drivers should allow extra travel time, use caution, be prepared to slow down and merge safely when approaching and traveling through all work zones.

US 60
ADT News
Full closures for this project, which is replacing the Queen Creek Bridge and Waterfall Canyon Bridge east of Superior, are normally scheduled from 9 a.m. to 2 p.m. Tuesdays, Wednesdays and Thursdays