Overview

The Arizona Department of Transportation (ADOT) is conducting a Tier 2 Environmental Impact Statement (EIS) and Design Concept Report (DCR) for North-South Segment 2 from Arizona Farms Road to Interstate 10 (SR 505). The Segment 2 study corridor spans approximately 31 miles from Florence to Eloy. Segment 1 of the North-South corridor between US 60 and Arizona Farms Road is a separate but related effort that is also underway.

In 2021, ADOT selected a 1,500-foot North-South Corridor route as part of the previous Tier 1 Environmental Impact Statement (EIS) study. ADOT will now be conducting a Tier 2 EIS study, which will refine the corridor to a preferred 400-foot SR 505 highway alignment and identify the location of interchanges and other features.

During the current study phase, ADOT is seeking public input on the project purpose and need, as well as anything the study team should consider in developing preliminary alternatives for the highway alignment and potential interchange locations through Sept. 8, 2025. Public meetings were held in August 2025 to provide information on the study and seek the public’s input. See meeting information below.

To learn more about the study and to provide comments on the current study phase, visit the North-South Segment 2 project website

Map

View an interactive map of the North-South Corridor

Map of North-South study area

2025 Public Meeting Materials

Public meetings were held to provide information about the current phase of the study and to seek input on the preliminary range of alternatives, as well as the preliminary project purpose and need.

Meetings were held on Aug. 7, 2025 in Florence, Aug. 12, 2025 in Eloy, and Aug. 14, 2025 virtually. Meeting documents are linked below.

More Information/Provide Input

Visit www.northsouth-segment2.com to learn more and provide comments. The public can provide comments on the current study phase through September 8, 2025 in any of the following ways

The environmental review, consultation and other actions required by applicable Federal environmental laws for this project are being or have been carried out by ADOT pursuant to 23 USC 327 and a Memorandum of Understanding dated 06/25/2024 and executed by FHWA and ADOT.