Certification Intent and Purpose
Through the Certification Acceptance (CA) Agreement, ADOT and the CA Agency will adhere to the responsibilities and requirements set forth by Federal Highway Administration (FHWA) when implementing the Federal Aid Highway Program (FAHP) in Arizona. This page will show up-to-date information on the certification process for current and new CA agencies and provide ADOT’s expectations for the CA Agency in delivering the FAHP, including the necessary project delivery processes and procedures.
See also: CA Certification Academy (8/16/23) documentation
Instructions for Submittals
The Certification Assessment Packet provides guidance for the Agency to evaluate and/or develop procedures in the administrative areas identified in the CA Agreement for compliance in delivering the FAHP.
Below is the schedule with due dates and instructions for Certification Assessment Packet section submittals. Completed section submittals must be uploaded using ShareFile, a secure, online file transfer and sharing tool. CA Liaisons will receive an email invite linking them to a CA Agency designated folder to upload submittals.
This page contains essential documents and assessment questions related to each administrative area requiring ADOT review and approval. Please note:
- The due date for the submission of the checklist and corresponding document(s) listed. Documents provided after the final ADOT submittal date for that submittal may jeopardize the Agency’s CA status.
- Locate the Agency document(s) or manual(s) where procedures are housed for delivering FAHP projects.
- Compare and evaluate the current Agency procedures contained within the Agency’s document(s) or manual(s) with the questions on the checklist.
- Update the current Agency procedures, where necessary.
- Identify the document, page, and paragraph for each question.
- Check the box if there is a change from what was approved in 2019
- Fill in the “Prepared by” box identifying who in the Agency verified the Agency’s procedures and answered each question to complete the checklist.
- Submit the checklist and corresponding document(s) to the ADOT LPA Section.
- Please flag applicable pages within lengthy documents.
- Incomplete Assessment submittals will not be accepted. Should a CA Agency be unable to submit or complete their assessment checklists as required, their 2024 certification may be placed at risk and necessitate projects to be transferred to ADOT. These actions will result in intergovernmental agreements needing to be established until the Agency is certified.
Certification Assessment Packet Submittal Section Checklists and Due Dates
Follow steps 1 and 2 below:
1. Download the Certification Assessment Packet submittal section checklists and additional resources from the hyperlinks below
PACKET SECTION NAME | ADOT SECTION TO REVIEW | POINT OF CONTACT (POC) | DATE DUE FROM CA TO POC |
---|---|---|---|
DBE Procedures | BECO | Cyndi Callahan | October 6, 2023 |
Right of Way Procedures | Right of Way Group | Jennifer Catapano | October 6, 2023 |
Communication Plan | ADOT LPA Process | Cyndi Callahan | November 3, 2023 |
Procurement of Materials and/or Install ADOT Procurement Checklist |
Procurement Group | Jennifer Catapano | November 3, 2023 |
Pavement Design Design Guidelines Design Exceptions & Variances |
Roadway Engineering | Ben Robideau | November 3, 2023 |
Financial Management Procedures | ADOT LPA Process | Jennifer Catapano | December 8, 2023 |
Materials QA Program | Materials Group | Cyndi Callahan | December 8, 2023 |
Procurement of a Consultant |
Engineering Consultants Section | Rolanda Smedley | December 8, 2023 |
Subcontract Approval Procedures | ADOT LPA Process | Ben Robideau | December 8, 2023 |
Bid Analysis and Award Procedures | ADOT LPA Process | Rolanda Smedley | January 26, 2024 |
Bridge Procedures (NEW) | Bridge Group | Ben Robideau | January 26, 2024 |
Reporting Procedures | ADOT LPA Process | Jennifer Catapano | January 26, 2024 |
Staffing Plan | ADOT LPA Process | Cyndi Callahan | January 26, 2024 |
Audit and Oversight Procedures | ADOT LPA Process | Rolanda Smedley | February 23, 2024 |
Project Delivery Manual | ADOT LPA Process | Ben Robideau | February 23, 2024 |
Checklists are reviewed for completeness by the POC prior to being sent to the Reviewer. If a checklist is found to be incomplete at the point of submission, it will be returned to the CA for correction with a 2-business day turnaround.
Additional Resources:
2. Title each submittal section using the naming convention below:
Date_CA Agency Name_Document Title