Interstate 19 East Frontage Road Study from Ruby Road to Rio Rico Drive

Interstate 19 East Frontage Road Study from Ruby Road to Rio Rico Drive

Completed 2018 - In 2012, the Arizona Department of Transportation and the Federal Highway Administration began working on a study to enhance traffic flow at the I-19 and Ruby Road traffic interchange and along the I-19 east frontage road from Ruby Road to Rio Rico Drive. In 2016, the study transitioned to an east and west frontage road study between Ruby Road and Rio Rico Drive. The study has included collaboration with community representatives and jurisdictions, including Rio Rico, Santa Cruz County and the city of Nogales.

The purpose of the study is to improve traffic flow and meet current and future traffic needs in this area. The study evaluated existing and projected peak-hour traffic operations and developed alternatives for potential capacity and operational improvements to accommodate forecasted growth through the year 2040.

 

Documents

 

An Active and Growing Corridor

  • The Rio Rico community, which was established in 1969 and has grown from 1,400 residents in 1990 to the current estimate of 20,000, is part of this study area.
  • The I-19 East Frontage Road between Ruby Road and Rico Drive provides sole access to a warehouse district that is used by commercial trucks transporting goods along U.S.-Mexico trade routes.
  • The I-19 East Frontage Road between Ruby Road and Rico Drive features two-way traffic (north- and southbound) from Ruby Road to Kipper Street and one-way traffic (northbound only) from Kipper Street to Rio Rico Drive (0.8 mile segment).
  • Based on the current traffic configuration, all traffic entering the warehouse district must use the Ruby Road traffic interchange, while traffic exiting the warehouse district may use either the Ruby Road or Rio Rico Drive traffic interchange.
  • There are also residential traffic and school buses in the area, which travel between the east and west sides of I-19.

 

Meetings and Events

Sept. 13, 2017 Public Information Meeting

The Arizona Department of Transportation (ADOT) and the Federal Highway Administration (FHWA) are taking the next steps to select a preferred alternative for the I-19 East Frontage Road project from Ruby Road to Rio Rico Drive. Residents, business owners and other stakeholders are encouraged to attend the public meeting, ask questions and provide comments on the proposed alternatives for this busy transportation corridor:

The meeting will be in an open-house format with a formal presentation at 6:30 p.m. Your input is very important and will be considered to determine which corridor alternative will be advanced for design and construction in the future. The meeting will be followed by a 30-day public comment period.

If you are unable to attend the meeting, you can provide comments or ask questions in these ways:

  • Call the ADOT Project Information Line at 855.712.8530
  • Email [email protected]
  • Mail written comments to:
  • ADOT Communications, 1655 W. Jackson Street, MD 126F, Phoenix, Ariz., 85007

Meeting Post Cards - I-19 East Frontage Road Study from Ruby Road to Rio Rico Drive
Meeting Post cards

Time: 6 to 7:30 p.m.
Date: Wednesday, Sept. 13, 2017

Location:
Calabasas Middle School
131 Camino Maricopa
Rio Rico, Ariz. 85648