Skip to main content
911

Lane restrictions on north- and southbound US 95 will continue through November

The Arizona Department of Transportation advises motorists to plan for a flagging operation along the US 95 and Imperial Dam and Aberdeen road intersections in Yuma, as crews construct new roundabouts. 

The following daytime flagging operations are scheduled from 7 a.m. to 4 p.m.:  

  • Flaggers will direct traffic at the intersection of US 95 and Aberdeen Road on Thursday, Oct. 1, and Friday, Oct. 2.
  • Flaggers will control traffic at the intersection of US 95 and Imperial Dam Road from Monday, Oct. 5, through Friday, Oct. 9.
  • The speed limit will be reduced to 25 mph.

Motorists can expect the following around-the-clock restrictions:

  • North- and southbound US 95 will be narrowed to one lane in each direction between Imperial Dam Road and Aberdeen Road. 
  • The speed limit will be reduced to 25 mph.

Delays are likely, so allow extra travel time. Proceed through the work zone with caution, slow down and watch for construction and law enforcement personnel and equipment.

Close alert
Example of scam text
Please ignore these texts, which feature a graphic laced with enough bad grammar, botched punctuation, tortured syntax and errors of fact to enrage your favorite English teacher. And please do not
Map showing the I-10 project area near East Globe, Arizona, from milepost 256 to milepost 259.5
Two men work on footings on the roadside
three construction crew members working on the roadside with heavy machinery
The Arizona Department of Transportation is conducting a roadway lighting project on US 70 located east of Globe (mileposts 256-259).
Map showing a project area highlighted in orange along US 160 from milepost MP321 near Tuba City and Moenkopi to milepost MP335 within Navajo Nation. A legend identifies the project area and mileposts, and the map notes it is not to scale.

Project cost: $20.5 million

The Arizona Department of Transportation, in cooperation with the Navajo Nation and Hopi Tribe, has initiated a pavement preservation project along US 160 near Tuba City (mileposts 321-335).

Map showing a project area highlighted in orange along Route 64 between mileposts MP185 near Interstate 40 by Williams and MP205 near Pipeline Road, with Flagstaff indicated to the east. A legend marks the project area and mileposts, and the map notes it is not to scale.

Project cost: $33,000,000

The Arizona Department of Transportation has initiated a pavement preservation project along State Route 64 between I-40 in Williams and Pipeline Road (mileposts 185-205).

File photo of I-17
The Arizona Department of Transportation is targeting pavement improvements and expanding several key highways in the $9.85 billion Tentative Five-Year Transportation Facilities Construction Program
Joe Heller, our resident engineer on a big project getting underway in the North Valley, joins On the Road With ADOT this week to explain what's coming over the next two and a half years, including a flyover ramp connecting northbound I-17 with Loop 303.
A major component of the work will be building the direct ramps to create the freeway-to-freeway interchange. When completed over the next two-and-a-half years, drivers will skip the traffic signals at the current Loop 303/I-17 diamond interchange.
TeleMVD Mobile Kiosk
Mobile kiosks are allowing the Homeless ID Project and the Arizona Department of Transportation Motor Vehicle Division to expand efforts to provide state-issued driver licenses and ID cards for those
Engineers at ADOT play a vital role in building and maintaining Arizona’s roads. During National Engineers Week, Feb. 22-28, we’re celebrating engineers and the work they do to keep Arizona moving.