I-17 Willard Springs Wildlife Overpass  Map

Project cost: $21 million

The Arizona Department of Transportation has initiated a wildlife overpass and fence installation project along Interstate 17 between Kelly Canyon and Munds Park (mileposts 322-331) south of Flagstaff.

Map of I-40 Bellemont Traffic Interchange Concept Report
Completed

This project is complete

The Arizona Department of Transportation, in cooperation with Coconino County, has completed a Design Concept Report (DCR) Update for the Bellemont (Hughes Avenue) Traffic Interchange (TI) located on Interstate 40 at milepost (MP) 185.

Project Map I-40 Broadband: AZ-CA Stateline to Flagstaff
The Arizona Department of Transportation has initiated a project to install more than 200 miles of high-speed fiber-optic infrastructure along Interstate 40 between the Arizona-California state line and Flagstaff (mileposts 0-201).
Map image I-40 Transwestern Road to I-17 Variable Speed Limit Signage System
ADOT is installing variable speed limit signs on I-40 between Bellemont and Flagstaff (mileposts 185–195) to help drivers adjust speed during bad weather, crashes, or construction. Construction began in late spring 2026 and anticipated for completion by late fall 2026.
I-40 Two Guns to Dennison Pavement Preservation Project Map

Project Cost: $25 million

The Arizona Department of Transportation has initiated a pavement preservation project along I-40 approximately 15 miles west of Winslow between the Two Guns and Meteor CIty Road (mileposts 230-240). The project began in late summer 2025 and anticipated for completion by fall 2026.

Map SR 260 Lion Springs Improvement Project
The Arizona Department of Transportation began construction on the State Route 260 Lion Springs Improvement project east of Payson in June 2026. The project is anticipated to take approximately two and one-half years to complete.
Map showing a project area highlighted in orange along Route 64 between mileposts MP185 near Interstate 40 by Williams and MP205 near Pipeline Road, with Flagstaff indicated to the east. A legend marks the project area and mileposts, and the map notes it is not to scale.

Project cost: $33,000,000

The Arizona Department of Transportation has initiated a pavement preservation project along State Route 64 between I-40 in Williams and Pipeline Road (mileposts 185-205).

ADOT Project Map of State Route 179 Pavement Preservation - Red Rock Ranger Station to Chapel Road

Project cost: $4.2 million

The Arizona Department of Transportation has initiated a pavement preservation project along State Route 179 between the Red Rock Ranger Station just south of the Village of Oak Creek and Chapel Road (mileposts 304-311).

Map SR 87 Green Valley Pkwy (MP 251 - 256)

Project Cost:12 million

The Arizona Department of Transportation has initiated a street improvement project along State Route 87 between Green Valley Parkway and Crackerjack Road in Payson (mileposts 251-256).

Map showing a project area highlighted in orange along US 160 from milepost MP321 near Tuba City and Moenkopi to milepost MP335 within Navajo Nation. A legend identifies the project area and mileposts, and the map notes it is not to scale.

Project cost: $20.5 million

The Arizona Department of Transportation, in cooperation with the Navajo Nation and Hopi Tribe, has initiated a pavement preservation project along US 160 near Tuba City (mileposts 321-335).