After six months of extensive earthwork on the US 89 landslide repair project south of Page, ADOT is moving on to the final phase of the project to restore the highway.
State Route 89A in the Oak Creek Canyon switchbacks (mileposts 387-390) was fully reopened this afternoon after crews repaired a sinkhole that had been discovered in the northbound lane on Saturday.
ADOT has begun construction of a northbound climbing lane on SR 95 to improve traffic flow through the Mohave Mountains region, about 10 miles north of Lake Havasu City (mileposts 190-195).