… Overview The Arizona Department of Transportation, in … on the south side of Mews Road Installing a new 36-inch concrete storm drain pipe east of the Higley/Mews roads intersection Pouring new sidewalk and ramps at the Mews/Higley …
… Overview The Arizona Department of Transportation is … (removing) the old asphalt and repaving with new asphalt. Sidewalk, curb and gutter, … Elements Replace existing asphalt with new asphalt Sidewalk, curb, gutter and …
… Overview The Arizona Department of Transportation began a … and replacing the existing pavement with new pavement Replacing guardrail and guardrail end terminals Installing new fence and pipe end sections Installing new …
… The Arizona Department of Transportation is … Deck repairs of the Canyon De Oro Bridge New curb, gutters, sidewalks, sidewalks ramps in select locations New fencing Traffic Signs New pavement …
… Overview The Arizona Department of Transportation, in … at the I-17 ramps and frontage roads New roadways approaching the flyover bridge … Road to accommodate the flyover bridge and new approaches, and Two new pedestrian bridges …
… Overview The Arizona Department of Transportation completed … projects Project Area Project Elements A new Direct High-Occupancy Vehicle (DHOV) ramp … of Loop 101 and I-10 to accommodate the new DHOV ramp A new connection from the south …
… Overview The Arizona Department of Transportation completed … Maricopa Association of Governments approved new funding to implement additional US 60 … 60. Other improvements included restriping, new signs, traffic-signal timing adjustments …
… A major effort that began in 2012 to update Arizona’s Strategic Highway Safety Plan (SHSP) reached a milestone last year when a new plan was formally approved. Now that it is … statewide collaborated on the state’s new SHSP. The update was a big endeavor and I …
… Cost : $25,252,525 million Overview The Arizona Department of Transportation started … the existing pavement and replacing it with new pavement. Removing and installing new guardrail. Repairing the bridge decks. …
… Overview Project Cost: $80.6 million The Arizona Department of Transportation started … mileposts 106 and 110. Constructing two new bridges over Cane Springs Wash and … the entire 200-mile segment of US 93 in Arizona between Wickenburg and the state line. …