After an extended stretch of dry weather, Arizona drivers should prepare for driving in the rain – or in snow at higher elevations – late this week and into the weekend.
We've already widened 161 miles of US 93, the main route between Phoenix and Las Vegas, to divided four-lane highway. Now we're launching a project to widen nearly 4 more miles.
Here are some tips to help cut down on frustrations while crews are doing the important job of widening 13 miles of the Loop 101 Pima Freeway east of I-17.
A video by the National Operations Center of Excellence features an ADOT engineer explaining the benefits from new striping and signs along a westbound stretch in Tempe.
Interstate 10: Earley Road to Interstate 8If a picture is worth a thousand words, then slideshows of our I-10 widening projects in Casa Grande and the Eloy area are worth many thousands.
Learn more about work to replace a box culvert at I-17 and Pinnacle Peak Road and why it's critical to a project to create a modern diamond interchange there.
In the midst of the Great Depression the state Highway Commission came up with an idea to boost Arizona's copper industry through some unusual license plates.
Work to create a modern Ina Road interchange with I-10 maintains and improves connections with The Loop, a system of trails and bike routes in the Tucson area.
ADOT's International Border Inspection Qualification has helped Mexican truckers achieve a more than 99 percent success rate on safety inspections while crossing the international border.