The Arizona Department of Transportation is scheduled to widen US 95 between milepost 43 (near Imperial Dam Road) and milepost 48 (near Aberdeen Road).
The Arizona Department of Transportation is designing a project to widen US 95 between the Wellton-Mohawk Canal (milepost 38.5) and Imperial Dam Road (milepost 43.4).